Pledge: Basement plumbing: Difference between revisions

From London Hackspace Wiki
No edit summary
No edit summary
Line 24: Line 24:
* £400 -- Biohackers
* £400 -- Biohackers
* £50 - Tom Hodder
* £50 - Tom Hodder
* £25 - [[User:JasperWallace]]


Running total: '''£450'''
Running total: '''£475'''


Target: '''£350'''
Target: '''£350'''


[[Category:Pledges]]
[[Category:Pledges]]

Revision as of 01:21, 1 October 2013


Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013

Pledge leader: Will

The items

  • A pump to push waste water upstairs to main drain pipe.
  • Inflow and drainage pipes.

We should then have

  • Sink in the main workshop area with HOT WATER!
  • 1 Sink in PCB/darkroom area
  • working PCB etching tank
  • Sink in the Biolab


Budget estimation

  • £800. (£590 for pump, rest on pipes. )

Pledges

Running total: £475

Target: £350