Project:Darkroom: Difference between revisions

From London Hackspace Wiki
(outdated page)
 
(25 intermediate revisions by 5 users not shown)
Line 1: Line 1:
[[File:project_darkroom.jpg|500px|thumb|The space]]
 
[[File:project_darkroom.jpg|100px|thumb|The space before the buildup]]
= Status =  
= Status =  
A new group is forming to set up a new darkroom/wet lab in the new space! [[User:Blanca|Blanca Regina]] 19:23, 9 February 2014 (UTC)
21:33,1 August 2015 [[User:Blanca|Blanca Regina]] The darkroom area is built and started as a group.
We are gonna pledge for the materials we need and try to get on the construction to have something ready before the open day 1st june 2014
A big darkroom sink has been installed and benches built and painted. The darkroom is operative.
The sink use its for darkroom, screenprint and holography.
The initial pledge for building the space was used.
For joining, buying and donating material darkroom/ screenprint training sessions please write to the list https://groups.google.com/forum/#!forum/lhs-darkroom
Supporters for finishing the building benches for Screenprinting do get in touch.
https://wiki.london.hackspace.org.uk/view/Project:Screen_Printing .


= What is it? =  
= What is it? =  
A multipurpose space,a combined darkroom & wet room, ideal for photographers, film developing and screen printing and other people who want to do dark, wet things. The initial goal is to set the darkroom up and running suitable for black & white developing/printing/toning/screenprinting.


In the diagram, you can see the wet working area is at the back of the room. There's is the plumbing ready to fit a sink at one end. This bench is for all "wet work" – processing film and more. a In front of this area a big table 2 meters long at least for "dry area". We will build storage shelves under the benches and above the sink.  
A multipurpose space,a combined darkroom & wet room, ideal for photographers, film developing and screen printing and other people who want to do dark, wet things. The initial goal is to set the darkroom up and running suitable for black & white / color / photo/ film developing/printing/toning/screenprinting.
 
In the photos you can see the space of the darkroom ( newly painted in july 2015.)
The sink and benches.
 
To be developed  In front of this area a big table 2 meters long at least for "dry area".
Looking for big trays and equipment.


= Where is it? =  
= Where is it? =  
In the basement
In the basement


= What's the state of play? =  
= What's the state of play? =  
[[File:Darkroom.png|200px|thumb|A sketch of the darkroom layout proposal in the basement. New wall is highlighted in red.]]
[[File:Darkroom.png|200px|thumb|A sketch of the darkroom layout proposal in the basement. New wall is highlighted in red.]]
PDF version of the darkroom layout proposal: [[File:Darkroom_Proposal.pdf]]
PDF version of the darkroom layout proposal: [[File:Darkroom_Proposal.pdf]]
New photos of the Darkroom
21:33,1 August  2015 [[User:Blanca|Blanca Regina]]  So far, installation is ready . We need buildup in the front room for screenprint. Schedule trainings and getting equipment <br> Join to the list https://groups.google.com/forum/#!forum/lhs-darkroom.


So far, the plumbing is ready. There are some small sinks but ideally we will like to get an industrial one with shower or around 1.5 meters long ( 100 pounds second hand)
Sat 10th Jan 2015 Update:<br>
We acquired a proper darkroom 3-section sink (see pic) <br>
[[File:Darkroom-sink-overview.jpg|200px|thumb|The Sink]]
Walls about 2/3 done. Electrics started. Double tube fitting installed (working) above etch tank to replace the one which needed removal to facilitate the wall.
There is need to build up a wall that divides it from the etching and dry area and isolates it from the dust and other workshop facilities.
There is need to build up a wall that divides it from the etching and dry area and isolates it from the dust and other workshop facilities.
As well there is a need to build the wall and set up a curtain as its sketched in the map.
As well there is a need to build the wall and set up a curtain as its sketched in the map.
Line 25: Line 42:
Currently there's  '''two''' sockets. All need to be rewired around the room-
Currently there's  '''two''' sockets. All need to be rewired around the room-


We need a light switch on the inside of the room with a light on the outside that will show if someone is working on the room, and a working lock (which is unlockable from the outside using a large flat-blade screwdriver in case of emergencies). The light switch and the door lock handle both have glow in the dark tape on it. This should be safe for most film purposes but generally keep your film away from it when loading it into the developing tanks (when we acquire these).  
We need a light switch (pull-switch inline on fluoro probably) on the inside of the room with a light on the outside that will show if someone is working on the room, and a working lock (which is unlockable from the outside using a large flat-blade screwdriver in case of emergencies). The light switch and the door lock handle both have glow in the dark tape on it. This should be safe for most film purposes but generally keep your film away from it when loading it into the developing tanks (when we acquire these). Also need red (and maybe dark yellow) safelight installed.
After all the room needs to be  blacked out.  
After all the room needs to be  blacked out.  


Still on the To Do list:  
Still on the To Do list:  
# Build the multipurpose room
# Finish bench in the front room
# Screenprint users join https://groups.google.com/forum/#!forum/lhs-darkroom
# Run some test sessions & inductions to the dark/wet room.
# Run some test sessions & inductions to the dark/wet room.
# Plan the workshops for photography developing, film and screenprint
# Plan the workshops for photography developing, film and screenprint


= Who's involved? =  
= Who's involved? =  
* [[User:padski|PaddyD]]
* [[User:Blanca|Blanca Regina]]
* [[User:Blanca|Blanca Regina]]
* Sally Golding
* Sally Golding
* [[User:wyan|Ruben Wyan]]
* [[User:Emmet|emmetgreen]]
* [[User:wyan|wyan]]
*  [[User:Bouvierpatron|Pierre]]  
*  [[User:Bouvierpatron|Pierre]]  
* [[User:Doing|Doing]]   
* [[User:Doing|Doing]]   
Line 58: Line 78:
* Smfenn
* Smfenn
* Laura
* Laura
* [[User:jasiek|jasiek]]
* [[User:Datagramm|datagramm]]
* [[User:Datagramm|datagramm]]
* [[User:Yuripattison|Yuri Pattison]]
* [[User:Yuripattison|Yuri Pattison]]
* Matt Kay
* Matt Kay
* [[User:Lesterhawksby]]


= Shopping list =  
= Shopping list =  


See pledge page https://wiki.london.hackspace.org.uk/view/Pledge:_Darkroom
Curtains for isolating==  
 
 
Measures
 
Tall of the side  2.50
Tall of the front 2.46
Tall inside 2.70
Tall where the grey floor .269
 
 
 
I just got this infos extra about suppliers ( Alice White recommended this ) arnold laver . Timberworld.co.uk
Phone 01708529500
 
==  Curtains for isolating==
==  Big industrial sink==
 
We are looking for big sinks regarding industrial sinks were to expensive.
We need some basic plumbing
 
Offer: I have a big sink that was originally built for a school darkroom in long-ago aeons. It has three big rectangular sections each with their own drainage, suitable for holding dev/stop/fix trays. It's about five or six feet long. It's in my shed in a shabby state and was turned down (unexamined) for the old Cremer St darkroom effort as too big, but I've finally seen the new space and it looks like it would fit well there. ping me at myname at gmail.com if interested in taking a look - *free to the Space if wanted*. I'm planning on pressure washing it to see if it cleans up nice. (I'm just returning to the space after some years away - I loaned the Meopta enlarger and timer and  donated a lot of tanks, paper etc to the old darkroom effort, looks like you still have some of it) - lesterhawksby
 
== Photography ==
* Chemical storage tanks/bottles for working solution (ideally burpable ones)
* Chemical storage tanks/bottles for working solution (ideally burpable ones)
* Trays
* Wood for benches
...


= Future Projects =
= Future Projects =
Line 97: Line 99:
* [http://www.imagesco.com/articles/kirlian/kirlian-photography-device.html Kirlian Photography]
* [http://www.imagesco.com/articles/kirlian/kirlian-photography-device.html Kirlian Photography]


[[Category:Projects]]
[[Category:Outdated Pages]]
[[Category:Infrastructure]]
[[Category:Space_Infrastructure_Projects]]

Latest revision as of 18:50, 21 October 2021

The space before the buildup

Status

21:33,1 August 2015 Blanca Regina The darkroom area is built and started as a group. A big darkroom sink has been installed and benches built and painted. The darkroom is operative. The sink use its for darkroom, screenprint and holography. The initial pledge for building the space was used. For joining, buying and donating material darkroom/ screenprint training sessions please write to the list https://groups.google.com/forum/#!forum/lhs-darkroom Supporters for finishing the building benches for Screenprinting do get in touch. https://wiki.london.hackspace.org.uk/view/Project:Screen_Printing .

What is it?

A multipurpose space,a combined darkroom & wet room, ideal for photographers, film developing and screen printing and other people who want to do dark, wet things. The initial goal is to set the darkroom up and running suitable for black & white / color / photo/ film developing/printing/toning/screenprinting.

In the photos you can see the space of the darkroom ( newly painted in july 2015.) The sink and benches.

To be developed In front of this area a big table 2 meters long at least for "dry area".

Looking for big trays and equipment.

Where is it?

In the basement

What's the state of play?

A sketch of the darkroom layout proposal in the basement. New wall is highlighted in red.

PDF version of the darkroom layout proposal: File:Darkroom Proposal.pdf New photos of the Darkroom

21:33,1 August 2015 Blanca Regina So far, installation is ready . We need buildup in the front room for screenprint. Schedule trainings and getting equipment
Join to the list https://groups.google.com/forum/#!forum/lhs-darkroom.

Sat 10th Jan 2015 Update:
We acquired a proper darkroom 3-section sink (see pic)

The Sink

Walls about 2/3 done. Electrics started. Double tube fitting installed (working) above etch tank to replace the one which needed removal to facilitate the wall. There is need to build up a wall that divides it from the etching and dry area and isolates it from the dust and other workshop facilities. As well there is a need to build the wall and set up a curtain as its sketched in the map. For the hot water we might need a heater. There is one for the kitchen facilities that is in storage we need to ask for it or another. There is some photography equipment but we may need to get all back and in good night. Locate the light unit for a light table and screen-print. Along that fit the rest of the equipment for film and screenprint processing Currently there's two sockets. All need to be rewired around the room-

We need a light switch (pull-switch inline on fluoro probably) on the inside of the room with a light on the outside that will show if someone is working on the room, and a working lock (which is unlockable from the outside using a large flat-blade screwdriver in case of emergencies). The light switch and the door lock handle both have glow in the dark tape on it. This should be safe for most film purposes but generally keep your film away from it when loading it into the developing tanks (when we acquire these). Also need red (and maybe dark yellow) safelight installed. After all the room needs to be blacked out.

Still on the To Do list:

  1. Finish bench in the front room
  2. Screenprint users join https://groups.google.com/forum/#!forum/lhs-darkroom
  3. Run some test sessions & inductions to the dark/wet room.
  4. Plan the workshops for photography developing, film and screenprint

Who's involved?

Those involved in same at Cremer St:

  • Phil helped out by building the benches and helping attach blackout curtain frames around the windows.
  • Nicholas helped clean out the room so we could see what's staying and what was just being stored in the room.
  • Paddy D plumbed in a sink (wombled to us by Billy) // again Paddy (doing some plumbing)
  • User:Atom helped with building and equipment setup
  • bugs was very helpful in explaining a biohacker's needs for the room.
  • bluboxthief was willing to pick up donated equipment.
  • Others wombled up equipment.


Other interested people

Shopping list

Curtains for isolating==

  • Chemical storage tanks/bottles for working solution (ideally burpable ones)
  • Trays
  • Wood for benches

...

Future Projects