People: Russ, Paddyd, Phil
People: Paddyd, Phil, Russ


We have sockets and 2.5mm cable aplenty.
We have sockets and 2.5mm cable aplenty.
Phil's already done the ring main and water heater circuit, and a few sockets. [[User:Ms7821|Ms7821]] 09:28, 16 February 2012 (UTC)
===Phil's List ===
16mm = 26m  (non armoured)
P-clips for 16mm = 50
4mm or 6mm T+E = 18m total
Clips to suit = 50
No more 2.5mm required  :)
Distribution board to be RCD type
Suggest a 6way  board, (room for expansion/reuse elsewhere if we move...)
Breakers  3x32A 1x16A 2x blanking covers


=== Planned ===
=== Planned ===


* Distro box: 3x32A breakers, 1x16A breaker
* Distro box: 3x32A breakers, 1x16A breaker (6 way suggested, so 2xblank)
* 1x63A breaker (presumably C 63, make for 3-phase is currently Hager NC316 C16 400V)
* Cables:
* Cables:
{| class="wikitable"
{| class="wikitable"
! Purpose !! Power !! Diameter !! Length
! Purpose !! Power !! Gauge !! Length
|-
|-
| Distro || 100A || 16mm ||
| Distro || 63A || [http://www.screwfix.com/p/prysmian-6242y-twin-earth-cable-grey-10mm-x-25m/99630 10mm^2]|| >>1m+14m+4m = 20m
|-
|-
| Oven || 5kW (>>22A) || 4mm ||
| Oven || 5kW (>>22A) || 4mm^2 || >>2m+2m = 5m
|-
|-
| Hob || 6kW/6.6kW (>>29A) || 4mm ||
| Hob || 6kW/6.6kW (>>29A) || 4mm^2 || >>2m+2m = 5m
|-
|-
| Water heater || guess 3kW (13A) || 2.5mm ||
| <s>Water heater</s> || guess 3kW (13A) || 2.5mm^2 || <s>>>2m = 3m</s>
|-
|-
| Ring main ||  || 2.5mm ||
| <s>Ring main</s> ||  || 2.5mm^2 || <s>>>((2m+2.5m+2.5m)+(2m+2m))*2 = 25m</s>
|}
|}
Upgrade diameters (4-6, 16-25) if not clipped to a masonry or wooden wall.
Phil suggests 18m for the 4mm and 26m for the distro feed
* 50xP-clips for 16mm
* 50xP-clips for 4mm


Upgrade all diameters (2.5-4, 4-6, 16-25) if not clipped to a masonry or wooden wall.
And to finish off the sockets:
* <s>5x Double dry lining boxes (25mm deep or more)</s>
* 2x single dry lining boxes (any depth)


=== Suggested suppliers===
=== Suggested suppliers===
Line 30: Line 57:
=== Back-up option ===
=== Back-up option ===
* 2x4mm runs, one for hob, one for oven
* 2x4mm runs, one for hob, one for oven
* Leave boiler on electric circuit or do a separate 2.5/4mm run for that.
* Put boiler on a fused spur or do a separate 2.5/4mm run for that.
 
[[Category:Prior_Hackspaces]]

Latest revision as of 17:49, 8 May 2013

People: Paddyd, Phil, Russ

We have sockets and 2.5mm cable aplenty.

Phil's already done the ring main and water heater circuit, and a few sockets. Ms7821 09:28, 16 February 2012 (UTC)

Phil's List

16mm = 26m (non armoured)

P-clips for 16mm = 50

4mm or 6mm T+E = 18m total

Clips to suit = 50

No more 2.5mm required  :)

Distribution board to be RCD type

Suggest a 6way board, (room for expansion/reuse elsewhere if we move...)

Breakers 3x32A 1x16A 2x blanking covers

Planned

  • Distro box: 3x32A breakers, 1x16A breaker (6 way suggested, so 2xblank)
  • 1x63A breaker (presumably C 63, make for 3-phase is currently Hager NC316 C16 400V)
  • Cables:
Purpose Power Gauge Length
Distro 63A 10mm^2 >>1m+14m+4m = 20m
Oven 5kW (>>22A) 4mm^2 >>2m+2m = 5m
Hob 6kW/6.6kW (>>29A) 4mm^2 >>2m+2m = 5m
Water heater guess 3kW (13A) 2.5mm^2 >>2m = 3m
Ring main 2.5mm^2 >>((2m+2.5m+2.5m)+(2m+2m))*2 = 25m

Upgrade diameters (4-6, 16-25) if not clipped to a masonry or wooden wall. Phil suggests 18m for the 4mm and 26m for the distro feed

  • 50xP-clips for 16mm
  • 50xP-clips for 4mm

And to finish off the sockets:

  • 5x Double dry lining boxes (25mm deep or more)
  • 2x single dry lining boxes (any depth)

Suggested suppliers

  • TLC-direct (cheap, but whole drum)
  • ?


Back-up option

  • 2x4mm runs, one for hob, one for oven
  • Put boiler on a fused spur or do a separate 2.5/4mm run for that.