'''Goal''': Move hackspace items which are not used regularly or on a day to day basis at the space ahead of the main move date in April. | '''Goal''': Move hackspace items which are not used regularly or on a day to day basis at the space ahead of the main move date in April. Please do not move anything not listed here without checking first. | ||
'''Date''': Items were moved on '''23rd March''', laptops and other things were moved when they shouldn't have been, rage ensued | '''Date''': Items were moved on '''23rd March''', laptops and other things were moved when they shouldn't have been, rage ensued | ||
Line 114: | Line 114: | ||
|Marc | |Marc | ||
|} | |} | ||
[[Category:Moving_Space]] |
Latest revision as of 20:54, 20 May 2013
Goal: Move hackspace items which are not used regularly or on a day to day basis at the space ahead of the main move date in April. Please do not move anything not listed here without checking first.
Date: Items were moved on 23rd March, laptops and other things were moved when they shouldn't have been, rage ensued
Saturday 23rd: We have a van from 2:30pm until 7:30pm
If you can list any of the things that could get moved here that'd be grand. If you're willing to volunteer get it prepped to move and potentially help us load/unload it that'd also be amazing.
Item(s) | Notes | Volunteer |
---|---|---|
Hipster is going to clean it before its moved | tgreer (talk) | |
tgreer (talk) | ||
tgreer (talk) | ||
Fahadsadah (talk) | ||
Pile of servers/network/comms kit under and on top of the desks in the quiet room. | tgreer (talk) | |
Project in early stages, not likely to have any work done before the more or for some weeks after. | Sci | |
Carpet rolls in quiet room, unless the quiet room carpet is to be replaced | tgreer (talk) | |
The mini lathe is packed up (parts in the black box on top) and ready to go. The green lathe is as well, but I've put the parts into two spare drawers of the 3-in-1 shelves. Both are VERY HEAVY and a lot more delicate than they look! | asoko (but I can't help move) | |
Cleaned, and the box containing attachments has been taped up. Ready to move. | asoko | |
(not the vinyl cutters, the big green/grey thing) -- cleaned and ready to move. | asoko | |
Fahadsadah (talk) | ||
Large items in the member's area, with their owner's approval | ||
Contents of room (toilet) behind laser cutter | ||
Not technically in storage room, but should be moved as well. | Sci | |
Not currently plumbed into gas, unusable until fitted at new space. | Sci | |
Large sheet materials near fire exit | ||
tgreer (talk) | ||
sue | ||
Got the stuff ready next to the library shelves. | Mentar | |
Basic space infrastructure - kettle, mugs, tea | Willing to bet that these will migrate over even before the pre-move move :-) | sue |
Now located with pre-move items but should not be buried in a box, possibly needed for electrical work in 447. - PaddyD's but consider them now donated. | Someone else. | |
On top of pre-move items in front of Library shelves | Sully | |
Now packed in box with speakers on the pile of Pre-move stuff - Still need to remove the mounted screen near Arcade Machine | Marc |