Laboratory 24/Infrastructure: Difference between revisions

From London Hackspace Wiki
 
(20 intermediate revisions by 8 users not shown)
Line 3: Line 3:
==Landlord==
==Landlord==


The centre manager is Ted Kerr (07730 200 260).
The centre manager is Ted Kerr (07730 200 260). Area manager is Paul - ask Russ to email him.
 
== Council ==
 
We currently don't pay rates, as the rateable value is £5250 + £400 for the parking spaces, and this is our first property.


==Phone Service==
==Phone Service==


There are two phone lines in the space:
There are two [[Phone | phone lines]] in the space:


* 020 7613 5391 (main phone, broadband)
* 020 7613 5391 (main phone, broadband)
Line 20: Line 16:
==[[Laboratory_24/Network|Networking]]==
==[[Laboratory_24/Network|Networking]]==


Internet is provided by [http://bethere.co.uk Be] - we have the Be Pro service on a 1 year contract (started 18/07/2010).
==Electricity==


IP:     93.97.176.250
Initial [[Electricity meter|meter]] reading: 251818 (16/07/2010)
Netmask: 255.255.248.0
254055 (12/10/2010)
Gateway: 93.97.176.1
DNS 1:  87.194.255.154
DNS 2:  87.194.255.154


The BeBox is operating in bridged mode with all routing handled by the Fonera.


Our internal network operates on the 172.31.24.0/23 range (this is registered with [http://wiki.hamburg.ccc.de/index.php/ChaosVPN::IPRanges ChaosVPN]).
Unit 23 readings, 2011/01/06:


We also advertise and route IPv6 within the spaceThis is currently tunnelled to [http://tunnelbroker.net Hurricane Electric]. The account is currently with [[User:Ms7821|Mark]], but will be transferred shortly.
red phase meter: no. L82A 52092 Reading: 13974.17
yellow  phase meter. No. L82A 46898  Reading: 39426.37
Blue phase meter. No L82A 12901 Reading 30877.19


IP prefix: 2001:470:92f1::/48


We do not use DHCP for IPv6 at the moment, so do not provide automatic rDNS.  [[System naming|Servers]] are set up for DNS under hack.rs, which is also currently with [[User:Ms7821|Mark]].
The new dist board (lower) is a Hager Invicta 63 TP&N 4 Way(JK04P)


The switch is a [http://www.3com.com/products/en_US/detail.jsp?tab=features&pathtype=purchase&sku=3CR17501-91 3CR17501-91]
==Water==


==Electricity==
* No. 99T043076  Reading 00233.10323
 
* No. 99T043073  Reading 05402.62862
Initial [[Electricity meter|meter]] reading: 251818 (16/07/2010)
254055 (12/10/2010)


==Alarm==
==Alarm==
Line 68: Line 59:


== Notes ==
== Notes ==
[[File:Lab_24_floor_plan.png|thumb|Floor plan]]
[[File:Lab_24_floor_plan.png|thumb|Floor plan of unit 24]]
 
All measurements in cm


* Main Room: 400 x 1140
* Main Room: 400 x 1140
* First Room: 350 x 690
* First Room: 350 x 690
* Front bit: 55 x 110
* Front bit: 55 x 110
* Dirty shop: 350 x 720
* Quiet Room: 350 x 720
* Back room: 250 x 400
* Kitchen: 250 x 400
* Fridge hole: 60 x 110
* Stratasys hole: 60 x 110


== Lighting ==
== Lighting ==
Line 83: Line 76:
* No toilet lighting in unit 23
* No toilet lighting in unit 23
* The strip of lights in unit 23 second from unit 24 flicker
* The strip of lights in unit 23 second from unit 24 flicker
* Three starters are missing in unit 23 (kitchen lights, one of the strips closest to unit 24)
* Two starters are missing in unit 23 (one of the strips closest to unit 24)
* There are spare starters underneath the consumer unit (fuse box) in unit 24.
* There are spare starters underneath the consumer unit (fuse box) in unit 24, but these are only suitable up to 65W and will not work in the large F100W lights in unit 23.
 
== Power ==


== Procedure for improving infrastructure ==
* Socket on partition unit 24 (near quiet room entrance) needs replacement
* More 13A sockets needed in workshop, especially on north wall
* Heavy cabling needed from fusebox to planned cooking area
* Temporary power sockets near sink need sorting (unless kitchen plans make them redundant)
* The 3 phase power is currently not being monitored. We can raise awareness about the use of electricity in the space and generated interest in energy monitoring through this project: [[Projects/Energy-Consumption-Monitoring|Energy Consumption Monitoring]]
 
== Procedure for improving [[infrastructure]] ==


* Get quote for item(s)
* Get quote for item(s)
* Discuss on irc/mailing list
* Discuss on irc/mailing list, optionally adding to the [[Infrastructure]] page
* Check finances with [[User:Russ|Russ]] or other Director
* Check finances with [[User:Russ|Russ]] or other Director
* Purchase item and obtain reimbursement / have item purchased directly from funds
* Purchase item and obtain reimbursement / have item purchased directly from funds
* Install item
* Install item
* Update the mailing list/wiki
== Parking ==
The parking spaces are 36, 37 and 54

Latest revision as of 17:47, 21 July 2012

We moved in on Friday the 16/07/2010.

Landlord

The centre manager is Ted Kerr (07730 200 260). Area manager is Paul - ask Russ to email him.

Phone Service

There are two phone lines in the space:

  • 020 7613 5391 (main phone, broadband)
  • 020 7729 5134 (unconnected)

Phone service is provided through M-Line, who are a great little BT reseller. Any problems, ring them up and ask for Strachan (pronounced straw-n). Say Russ Garrett sent you.

Networking

Electricity

Initial meter reading: 251818 (16/07/2010) 254055 (12/10/2010)


Unit 23 readings, 2011/01/06:

red phase meter: no. L82A 52092 Reading: 13974.17 yellow phase meter. No. L82A 46898 Reading: 39426.37 Blue phase meter. No L82A 12901 Reading 30877.19


The new dist board (lower) is a Hager Invicta 63 TP&N 4 Way(JK04P)

Water

  • No. 99T043076 Reading 00233.10323
  • No. 99T043073 Reading 05402.62862

Alarm

We don't use the alarm controller, but we do use the 12V UPS and sensors for the door controller. Much of the existing sensors and cabling is still in place.

UPS/PSU

The UPS model number is 1381N.

  • 12 volts, 1 amp output, 1.5 amp maximum (including battery charging)
  • Mains LED (green) indicates that mains is connected. Extinguishes if disconnected from mains or mains input fuse is blown.
  • Battery Stand-by LED (amber) indicates that unit is operating on battery stand-by. (does it? It's on all the time. seems to mean the battery is fine, unplugging the mains certainly powers the circuits off the battery, and the battery can't have been powering it the entire time...)
  • Output Fault (red) indicates that output fuse fault or battery fuse fault. Further LED (red) on PCB shows battery fuse failure.


Sensors

Conveniently, stripping the alarm out has left lots of useful wiring all over the building. We're already using a pair of wires to trigger the door release; there are plenty more cables though, some even wired into useful sensors (PIRs and door open/closed magnets)

Notes

Floor plan of unit 24

All measurements in cm

  • Main Room: 400 x 1140
  • First Room: 350 x 690
  • Front bit: 55 x 110
  • Quiet Room: 350 x 720
  • Kitchen: 250 x 400
  • Stratasys hole: 60 x 110

Lighting

  • Unit 24 tubes are L36W/23 or F36W (commonly known as "4ft slim")
  • Unit 23 tubes are F100W, except the kitchen which is F36W (as unit 24)
  • No toilet lighting in unit 23
  • The strip of lights in unit 23 second from unit 24 flicker
  • Two starters are missing in unit 23 (one of the strips closest to unit 24)
  • There are spare starters underneath the consumer unit (fuse box) in unit 24, but these are only suitable up to 65W and will not work in the large F100W lights in unit 23.

Power

  • Socket on partition unit 24 (near quiet room entrance) needs replacement
  • More 13A sockets needed in workshop, especially on north wall
  • Heavy cabling needed from fusebox to planned cooking area
  • Temporary power sockets near sink need sorting (unless kitchen plans make them redundant)
  • The 3 phase power is currently not being monitored. We can raise awareness about the use of electricity in the space and generated interest in energy monitoring through this project: Energy Consumption Monitoring

Procedure for improving infrastructure

  • Get quote for item(s)
  • Discuss on irc/mailing list, optionally adding to the Infrastructure page
  • Check finances with Russ or other Director
  • Purchase item and obtain reimbursement / have item purchased directly from funds
  • Install item
  • Update the mailing list/wiki

Parking

The parking spaces are 36, 37 and 54