Difference between revisions of "Hackspace Move/TODO"
Jump to navigation
Jump to search
Line 32: | Line 32: | ||
== basement == | == basement == | ||
− | * | + | * Filler walls |
− | * | + | * Sand walls |
− | * | + | * Paint walls |
− | * | + | * Paint metal shop floor |
− | * | + | * Clad miniworkshop walls |
− | ** | + | * Put up power/network trunking |
− | * | + | * Place tools |
− | * | + | * Place sockets/run cable |
− | * | + | * Run extraction to tools |
− | + | * Automate filtration | |
− | * | + | |
+ | * Run plumbing to workshop sink/biolab | ||
=== biohacker room === | === biohacker room === |
Revision as of 16:21, 10 April 2013
ground floor
class room
- fit power and network sockets in the new walls
- finish new walls.
lift and fix broken bits of floorwill probably need the shelving removed
- finish a few trunking bits
- fit access point to ceiling
- paint walls:
- what colour? plain matt white?
elsewhere
- more network sockets
- more power sockets
- clean under windows. - 1/4 done
quiet room
- run network to basement
- fit access point.
- move shelves
- paint walls? (they are a bit manky atm)
back door area
fix doorlock (please!).- finish some trunking bits.
- finish boxing in doorbot.
basement
- Filler walls
- Sand walls
- Paint walls
- Paint metal shop floor
- Clad miniworkshop walls
- Put up power/network trunking
- Place tools
- Place sockets/run cable
- Run extraction to tools
- Automate filtration
- Run plumbing to workshop sink/biolab
biohacker room
- power sockets? (not critical? - but they will need a fridge from day one?).
internets
fttc- config an access point
- test it
- clone config to other ap's