(Created page with " == ground floor == === class room === fit power and network sockets in the new walls finish new walls. <s>lift and fix bro...") |
|||
Line 1: | Line 1: | ||
− | |||
== ground floor == | == ground floor == | ||
− | |||
=== class room === | === class room === | ||
− | + | * fit power and network sockets in the new walls | |
− | + | * finish new walls. | |
− | + | * <s>lift and fix broken bits of floor</s> | |
− | + | ** <s>will probably need the shelving removed</s> | |
− | + | * finish a few trunking bits | |
− | + | * fit access point to ceiling | |
− | + | * paint walls: | |
− | + | ** what colour? plain matt white? | |
− | |||
− | |||
− | |||
− | |||
− | |||
=== elsewhere === | === elsewhere === | ||
− | + | * more network sockets | |
− | + | * more power sockets | |
− | + | * clean under windows. - 1/4 done | |
=== quiet room === | === quiet room === | ||
− | + | * run network to basement | |
− | + | * fit access point. | |
− | + | * move shelves | |
− | + | * paint walls? (they are a bit manky atm) | |
=== back door area === | === back door area === | ||
− | + | * <s>fix doorlock (please!).</s> | |
− | + | * finish some trunking bits. | |
− | + | * finish boxing in doorbot. | |
== basement == | == basement == | ||
− | + | * <s>fix heating.</s> | |
− | + | * run and fit power | |
− | + | * run network down from the ground floor - 8 cables | |
− | + | * <s>finish rockwooling</s> | |
− | + | * finish walls | |
− | + | ** fit air filters | |
− | + | * power and network sockets in walls | |
− | + | * run cables to access points (on ceiling). | |
− | + | * paint walls | |
− | + | * <s>clean floor</s> | |
− | + | * <s>paint floor</s> | |
=== biohacker room === | === biohacker room === | ||
− | + | * power sockets? (not critical? - but they will need a fridge from day one?). | |
− |
Revision as of 13:50, 10 April 2013
ground floor
class room
- fit power and network sockets in the new walls
- finish new walls.
lift and fix broken bits of floorwill probably need the shelving removed
- finish a few trunking bits
- fit access point to ceiling
- paint walls:
- what colour? plain matt white?
elsewhere
- more network sockets
- more power sockets
- clean under windows. - 1/4 done
quiet room
- run network to basement
- fit access point.
- move shelves
- paint walls? (they are a bit manky atm)
back door area
fix doorlock (please!).- finish some trunking bits.
- finish boxing in doorbot.
basement
fix heating.- run and fit power
- run network down from the ground floor - 8 cables
finish rockwooling- finish walls
- fit air filters
- power and network sockets in walls
- run cables to access points (on ceiling).
- paint walls
clean floorpaint floor
biohacker room
- power sockets? (not critical? - but they will need a fridge from day one?).