Line 1: | Line 1: | ||
− | == | + | |
− | === | + | = Pre Move = |
+ | |||
+ | All this stuff needs to be done before we can officially open | ||
+ | |||
+ | == Ground Floor == | ||
+ | |||
+ | === Classroom === | ||
* fit power and network sockets in the new walls | * fit power and network sockets in the new walls | ||
Line 11: | Line 17: | ||
** what colour? plain matt white? | ** what colour? plain matt white? | ||
− | === | + | === Lobby === |
+ | |||
+ | * fix doorbell | ||
+ | |||
+ | === Elsewhere === | ||
* more network sockets | * more network sockets | ||
Line 24: | Line 34: | ||
* paint walls? (they are a bit manky atm) | * paint walls? (they are a bit manky atm) | ||
− | === | + | === Back door area === |
* <s>fix doorlock (please!).</s> | * <s>fix doorlock (please!).</s> | ||
Line 30: | Line 40: | ||
* finish boxing in doorbot. | * finish boxing in doorbot. | ||
− | == | + | == Basement == |
+ | |||
===Workshop=== | ===Workshop=== | ||
Line 57: | Line 68: | ||
** <s>clone config to other ap's</s> | ** <s>clone config to other ap's</s> | ||
** mount access points tidly | ** mount access points tidly | ||
+ | |||
+ | = Post Move = | ||
+ | |||
+ | This is a list of things that arn't vital to the space function but need to get done | ||
+ | |||
+ | == Ground floor == | ||
+ | |||
+ | === Classroom === | ||
+ | |||
+ | * Fit projector screen | ||
+ | * Fit projector | ||
+ | * Led board | ||
+ | |||
+ | === elsewhere === | ||
+ | |||
+ | * lasercutter | ||
+ | |||
+ | === Lobby Area === | ||
+ | |||
+ | * signage | ||
+ | |||
+ | == basement == | ||
+ | |||
+ | * Led board | ||
+ | |||
+ | == Internets == | ||
+ | |||
+ | * fit and fix the bandwidth meter | ||
+ | * spacefed | ||
+ | * v6 tunnel (?) | ||
+ | * A&A v6 | ||
+ | * bufferbloat kernel and tuning | ||
+ | * bandwidth management of some kind. |
Revision as of 18:28, 10 April 2013
Pre Move
All this stuff needs to be done before we can officially open
Ground Floor
Classroom
- fit power and network sockets in the new walls
- finish new walls.
lift and fix broken bits of floorwill probably need the shelving removed
- finish a few trunking bits
- fit access point to ceiling
- paint walls:
- what colour? plain matt white?
Lobby
- fix doorbell
Elsewhere
- more network sockets
- more power sockets
- clean under windows. - 1/4 done
quiet room
- run network to basement
- fit access point.
- move shelves
- paint walls? (they are a bit manky atm)
Back door area
fix doorlock (please!).- finish some trunking bits.
- finish boxing in doorbot.
Basement
Workshop
- Filler walls
- Sand walls
- Paint walls
- Paint metal shop floor
- Clad miniworkshop walls
- Put up power/network trunking
- Place tools
- Place sockets/run cable
- Run extraction to tools
- Automate filtration
- Run plumbing to workshop sink/biolab
biohacker room
- power sockets
internets
fttcconfig an access pointtest itclone config to other ap's- mount access points tidly
Post Move
This is a list of things that arn't vital to the space function but need to get done
Ground floor
Classroom
- Fit projector screen
- Fit projector
- Led board
elsewhere
- lasercutter
Lobby Area
- signage
basement
- Led board
Internets
- fit and fix the bandwidth meter
- spacefed
- v6 tunnel (?)
- A&A v6
- bufferbloat kernel and tuning
- bandwidth management of some kind.