Difference between revisions of "Hackspace Move/TODO"
Jump to navigation
Jump to search
Line 31: | Line 31: | ||
* run network to basement | * run network to basement | ||
* <s>fit access point.</s> | * <s>fit access point.</s> | ||
− | * move shelves | + | * <s>move shelves</s> |
− | * paint walls | + | * paint walls |
+ | * clean windows | ||
+ | * replace damaged flooring | ||
=== Back door area === | === Back door area === |
Revision as of 18:11, 12 April 2013
Pre Move
All this stuff needs to be done before we can officially open
Ground Floor
Classroom
- fit power and
network socketsin the new walls. Network sockets done and gigabit certified. - finish new walls.
lift and fix broken bits of floorwill probably need the shelving removed
- finish a few trunking bits
- fit access point to ceiling
- paint walls:
- what colour? plain matt white?
Lobby
- fix doorbell
Elsewhere
- more network sockets
- more power sockets
- clean under windows. - 1/4 done
quiet room
- run network to basement
fit access point.move shelves- paint walls
- clean windows
- replace damaged flooring
Back door area
fix doorlock (please!).- finish some trunking bits.
- finish boxing in doorbot.
Basement
Workshop
Filler wallsPaint metal shop floor- Sand walls - Thursday
- Paint walls - Thursday
- Clad miniworkshop walls - Friday
- Put up power/network trunking - Friday
- Place tools - Saturday
- Place sockets/run cable - Saturday/Sunday
- Run extraction to tools
- Automate filtration
- Run plumbing to workshop sink/biolab
biohacker room
- power sockets
internets
fttcconfig an access pointtest itclone config to other ap's- mount access points tidly
Post Move
This is a list of things that arn't vital to the space function but need to get done
Ground floor
Classroom
- Fit projector screen
- Fit projector
- Led board
elsewhere
- lasercutter
Lobby Area
- signage
basement
- Led board
Internets
- fit and fix the bandwidth meter
- spacefed
- v6 tunnel (?)
- A&A v6
- bufferbloat kernel and tuning
- bandwidth management of some kind.