Hackspace Move/TODO
From London Hackspace Wiki
ground floor
class room
- fit power and network sockets in the new walls
- finish new walls.
lift and fix broken bits of floorwill probably need the shelving removed
- finish a few trunking bits
- fit access point to ceiling
- paint walls:
- what colour? plain matt white?
elsewhere
- more network sockets
- more power sockets
- clean under windows. - 1/4 done
quiet room
- run network to basement
- fit access point.
- move shelves
- paint walls? (they are a bit manky atm)
back door area
fix doorlock (please!).- finish some trunking bits.
- finish boxing in doorbot.
basement
fix heating.- run and fit power
- run network down from the ground floor - 8 cables
finish rockwooling- finish walls
- fit air filters
- power and network sockets in walls
- run cables to access points (on ceiling).
- paint walls -- this seems non-critical, and given the amount of other stuff we have to do, I propose leaving it until after the move.
clean floorpaint floor
biohacker room
- power sockets? (not critical? - but they will need a fridge from day one?).
internets
fttc- config an access point
- test it
- clone config to other ap's