Line 1: Line 1:
== ground floor ==
+
 
=== class room ===
+
= Pre  Move =
 +
 
 +
All this stuff needs to be done before we can officially open
 +
 
 +
== Ground Floor ==
 +
 
 +
=== Classroom ===
  
 
* fit power and network sockets in the new walls
 
* fit power and network sockets in the new walls
Line 11: Line 17:
 
** what colour? plain matt white?
 
** what colour? plain matt white?
  
=== elsewhere ===
+
=== Lobby ===
 +
 
 +
* fix doorbell
 +
 
 +
=== Elsewhere ===
  
 
* more network sockets
 
* more network sockets
Line 24: Line 34:
 
* paint walls? (they are a bit manky atm)
 
* paint walls? (they are a bit manky atm)
  
=== back door area ===
+
=== Back door area ===
  
 
* <s>fix doorlock (please!).</s>
 
* <s>fix doorlock (please!).</s>
Line 30: Line 40:
 
* finish boxing in doorbot.
 
* finish boxing in doorbot.
  
== basement ==
+
== Basement ==
 +
 
 
===Workshop===
 
===Workshop===
  
Line 57: Line 68:
 
** <s>clone config to other ap's</s>
 
** <s>clone config to other ap's</s>
 
** mount access points tidly
 
** mount access points tidly
 +
 +
= Post Move =
 +
 +
This is a list of things that arn't vital to the space function but need to get done
 +
 +
== Ground floor ==
 +
 +
=== Classroom ===
 +
 +
* Fit projector screen
 +
* Fit projector
 +
* Led board
 +
 +
=== elsewhere ===
 +
 +
* lasercutter
 +
 +
=== Lobby Area ===
 +
 +
* signage
 +
 +
== basement ==
 +
 +
* Led board
 +
 +
== Internets ==
 +
 +
* fit and fix the bandwidth meter
 +
* spacefed
 +
* v6 tunnel (?)
 +
* A&A v6
 +
* bufferbloat kernel and tuning
 +
* bandwidth management of some kind.

Revision as of 18:28, 10 April 2013

Pre Move

All this stuff needs to be done before we can officially open

Ground Floor

Classroom

  • fit power and network sockets in the new walls
  • finish new walls.
  • lift and fix broken bits of floor
    • will probably need the shelving removed
  • finish a few trunking bits
  • fit access point to ceiling
  • paint walls:
    • what colour? plain matt white?

Lobby

  • fix doorbell

Elsewhere

  • more network sockets
  • more power sockets
  • clean under windows. - 1/4 done

quiet room

  • run network to basement
  • fit access point.
  • move shelves
  • paint walls? (they are a bit manky atm)

Back door area

  • fix doorlock (please!).
  • finish some trunking bits.
  • finish boxing in doorbot.

Basement

Workshop

  • Filler walls
  • Sand walls
  • Paint walls
  • Paint metal shop floor
  • Clad miniworkshop walls
  • Put up power/network trunking
  • Place tools
  • Place sockets/run cable
  • Run extraction to tools
  • Automate filtration
  • Run plumbing to workshop sink/biolab

biohacker room

  • power sockets

internets

  • fttc
  • config an access point
    • test it
    • clone config to other ap's
    • mount access points tidly

Post Move

This is a list of things that arn't vital to the space function but need to get done

Ground floor

Classroom

  • Fit projector screen
  • Fit projector
  • Led board

elsewhere

  • lasercutter

Lobby Area

  • signage

basement

  • Led board

Internets

  • fit and fix the bandwidth meter
  • spacefed
  • v6 tunnel (?)
  • A&A v6
  • bufferbloat kernel and tuning
  • bandwidth management of some kind.