ground floor

class room

               fit power and network sockets in the new walls
               finish new walls.
               lift and fix broken bits of floor:
                       will probably need the shelving removed
               finish a few trunking bits
               fit access point to ceiling
               paint walls:
                       what colour? plain matt white?

elsewhere

               more network sockets
               more power sockets
               clean under windows. - 1/4 done

quiet room

               run network to basement
               fit access point.
               move shelves
               paint walls? (they are a bit manky atm)

back door area

               fix doorlock (please!).
               finish some trunking bits.
               finish boxing in doorbot.

basement

       fix heating.
       run and fit power
       run network down from the ground floor - 8 cables
       finish rockwooling
       finish walls
       power and network sockets in walls
       run cables to access points (on ceiling).
       paint walls
       clean floor
       paint floor

biohacker room

               power sockets? (not critical? - but they will need a fridge
               from day one?).