1,068
edits
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Electronics stations == | == Electronics stations == | ||
Responsible: [[user:mentar|mentar]] | |||
The plan is to have 2 soldering and 1 test bench upstairs | |||
== Etching station == | == Etching station == | ||
The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs near the biolab. | |||