Hackspace Move/Electronics: Difference between revisions

From London Hackspace Wiki

No edit summary
Line 8: Line 8:
== Etching station ==
== Etching station ==


The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs near the biolab.
The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs between the biolab and the lift shaft.