1,103
edits
| Line 6: | Line 6: | ||
** The main area | ** The main area | ||
** The classroom | ** The classroom | ||
* Fit the projector screen on the far classroom wall (opposite the door) | * Fit the projector screen on the far classroom wall (opposite the door) needs brackets making (accurate welding + metal forming), also very heavy will need more then one person. | ||
* Fit the skirting board in the quiet room | * Fit the skirting board in the quiet room | ||
* Tidy the quiet room into a quiet room rather than a bomb site | * Tidy the quiet room into a quiet room rather than a bomb site - should wait for the network cables to be done. | ||
* Move books from the back room next to the back door to the bookshelves | * Move books from the back room next to the back door to the bookshelves | ||
* Move electronics gear from the back room to the electronics area | * Move electronics gear from the back room to the electronics area | ||
* Fix lightbulbs in all the toilets | * Fix lightbulbs in all the toilets | ||
* Clean the kitchen | * Clean the kitchen - could do with painting and more shelves | ||
* Assemble all tables in the main room, and put them to one side, or in desk clusters | * Assemble all tables in the main room, and put them to one side, or in desk clusters | ||
* Empty the storage room next to the downstairs fire exit so we can store things in it. The blue foam can be put in the skip. | * Empty the storage room next to the downstairs fire exit so we can store things in it. The blue foam can be put in the skip. | ||
| Line 21: | Line 21: | ||
* Move the bins to the far end of the car park | * Move the bins to the far end of the car park | ||
* Clear the rubbish that has been shoved down the side of the wall in the car park (next to the front door) | * Clear the rubbish that has been shoved down the side of the wall in the car park (next to the front door) | ||
* Replace the bulbs in the car-park floodlights | * Replace the bulbs in the car-park floodlights - which ones, iirc they work? maybe you mean the loading bay? | ||
* Clear out and paint the entrance hall | * Clear out and paint the entrance hall | ||
* Paint the sign above the front entrance so it doesn't look horrible | * Paint the sign above the front entrance so it doesn't look horrible | ||