578
edits
mNo edit summary |
|||
| Line 23: | Line 23: | ||
The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs between the biolab and the lift shaft. | The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs between the biolab and the lift shaft. | ||
[[Category:Moving_Space]] | |||