Pledge: Basement plumbing: Difference between revisions

From London Hackspace Wiki
No edit summary
mNo edit summary
Line 27: Line 27:
* £25 - [[User:Billy Smith]]
* £25 - [[User:Billy Smith]]
* £25 - [[User:Detonate|Det]]
* £25 - [[User:Detonate|Det]]
* £25 - [[User:Mentar|Mentar]]
* £10 - [[User:Rob Kam|Rob Kam]]
* £10 - [[User:Rob Kam|Rob Kam]]


Running total: '''£510'''
Running total: '''£535'''


Target: '''£800'''
Target: '''£800'''


[[Category:Pledges]]
[[Category:Pledges]]

Revision as of 10:38, 1 October 2013


Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013

Pledge leader: Will

The items

  • A pump to push waste water upstairs to main drain pipe.
  • Inflow and drainage pipes.

We should then have

  • Sink in the main workshop area with HOT WATER!
  • 1 Sink in PCB/darkroom area
  • working PCB etching tank
  • Sink in the Biolab


Budget estimation

  • £800. (£590 for pump, rest on pipes. )

Pledges

Running total: £535

Target: £800