Pledge: Basement plumbing: Difference between revisions
From London Hackspace Wiki
mNo edit summary |
mNo edit summary |
||
Line 29: | Line 29: | ||
* £25 - [[User:Mentar|Mentar]] | * £25 - [[User:Mentar|Mentar]] | ||
* £10 - [[User:Rob Kam|Rob Kam]] | * £10 - [[User:Rob Kam|Rob Kam]] | ||
* £25 - [[User:Oni|Oni]] | |||
Running total: '''£535''' | Running total: '''£535''' |
Revision as of 10:53, 1 October 2013
Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013
Pledge leader: Will
The items
- A pump to push waste water upstairs to main drain pipe.
- Inflow and drainage pipes.
We should then have
- Sink in the main workshop area with HOT WATER!
- 1 Sink in PCB/darkroom area
- working PCB etching tank
- Sink in the Biolab
Budget estimation
- £800. (£590 for pump, rest on pipes. )
Pledges
- £400 -- Biohackers
- £50 - Tom Hodder
- £25 - User:JasperWallace
- £25 - User:Billy Smith
- £25 - Det
- £25 - Mentar
- £10 - Rob Kam
- £25 - Oni
Running total: £535
Target: £800