'''This page is old! For the continuing refurbishment of the space, see [[447_Hackney_Road/Improvements]]''' | |||
== Simple tasks that you can do right now == | == Simple tasks that you can do right now == | ||
Line 8: | Line 10: | ||
* Fit the projector screen on the far classroom wall (opposite the door) needs brackets making (accurate welding + metal forming), also very heavy will need more then one person. | * Fit the projector screen on the far classroom wall (opposite the door) needs brackets making (accurate welding + metal forming), also very heavy will need more then one person. | ||
* Fit the skirting board in the quiet room | * Fit the skirting board in the quiet room | ||
* Tidy the quiet room into a quiet room rather than a bomb site - should wait for the network cables to be done. | * <s>Tidy the quiet room into a quiet room rather than a bomb site - should wait for the network cables to be done</s>. | ||
* <s>Move books from the back room next to the back door to the bookshelves</s> | * <s>Move books from the back room next to the back door to the bookshelves</s> | ||
* Move electronics gear from the back room to the electronics area | * Move electronics gear from the back room to the electronics area | ||
Line 15: | Line 17: | ||
* <s>Clean the kitchen</s> - could do with painting <s>and more shelves</s> | * <s>Clean the kitchen</s> - could do with painting <s>and more shelves</s> | ||
* Assemble all tables in the main room, and put them to one side, or in desk clusters | * Assemble all tables in the main room, and put them to one side, or in desk clusters | ||
* Empty the storage room next to the downstairs fire exit so we can store things in it. The blue foam can be put in the skip. | * <s>Empty the storage room next to the downstairs fire exit so we can store things in it. The blue foam can be put in the skip</s>. | ||
* Collect the downstairs wood-pile into one place out of the way | * Collect the downstairs wood-pile into one place out of the way | ||
* Go through member boxes separating out boxes that are full of general equipment and do not belong to members, placing them on separate shelves that are clearly marked | * Go through member boxes separating out boxes that are full of general equipment and do not belong to members, placing them on separate shelves that are clearly marked | ||
* <s>Take up the remainder of the wooden floor downstairs</s> ON HOLD | * <s>Take up the remainder of the wooden floor downstairs</s> ON HOLD | ||
* Collect all the rubbish in the car-park and put it in the bin | * <s>Collect all the rubbish in the car-park and put it in the bin</s> | ||
** Litter picker and binbag just by doorbot inside | ** <s>Litter picker and binbag just by doorbot inside</s> | ||
* <s>Move the bins to the far end of the car park</s> | * <s>Move the bins to the far end of the car park</s> | ||
* Clear the rubbish that has been shoved down the side of the wall in the car park (next to the front door) | * Clear the rubbish that has been shoved down the side of the wall in the car park (next to the front door) | ||
* Replace the bulbs in the car-park floodlights - which ones, iirc they work? maybe you mean the loading bay? | * Replace the bulbs in the car-park floodlights - which ones, iirc they work? maybe you mean the loading bay? | ||
** The one above the loading bay and the two to the left of it work according to sol, that leaves just the one to the right of the doorbot door. Talk of replacing it with a super-led thing? | ** The one above the loading bay and the two to the left of it work according to sol, that leaves just the one to the right of the doorbot door. Talk of replacing it with a super-led thing? | ||
* Clear out and paint the entrance hall | * <s>Clear out and paint the entrance hall</s> - carpet is a bit nasty. | ||
* Paint the sign above the front entrance so it doesn't look horrible | * Paint the sign above the front entrance so it doesn't look horrible | ||
* Make a london hackspace sign for the back gate | * Make a london hackspace sign for the back gate | ||
Line 46: | Line 48: | ||
* <s>fix doorbell</s> done! | * <s>fix doorbell</s> done! | ||
* wire up a doorbot and the doorbell and bellpush etc. | * <s>wire up a doorbot and the doorbell and bellpush etc</s>. | ||
=== Elsewhere === | === Elsewhere === | ||
Line 68: | Line 70: | ||
* <s>fix doorlock (please!).</s> | * <s>fix doorlock (please!).</s> | ||
* finish some trunking bits. | * finish some trunking bits. | ||
* finish boxing in doorbot. | ** needs cctv sorting first | ||
* <s>finish boxing in doorbot.</s> | |||
== Basement == | == Basement == | ||
Line 100: | Line 103: | ||
** <s>test it</s> | ** <s>test it</s> | ||
** <s>clone config to other ap's</s> | ** <s>clone config to other ap's</s> | ||
** mount access points tidly | ** <s>mount access points tidly</s> | ||
= Post Move = | = Post Move = | ||
Line 120: | Line 123: | ||
=== elsewhere === | === elsewhere === | ||
* lasercutter | * <s>lasercutter</s> | ||
=== Lobby Area === | === Lobby Area === | ||
Line 132: | Line 135: | ||
== car park == | == car park == | ||
* We need an ashtray for the yard | * <s>We need an ashtray for the yard</s> | ||
== Internets == | == Internets == | ||
* <s>fit and fix the bandwidth meter</s> - really needs more sockets and babbage being moved. | * <s>fit and fix the bandwidth meter</s> - really needs more sockets and babbage being moved. | ||
* <s>spacefed</s | * <s>spacefed?</s> | ||
* v6 tunnel - will just use a&a now. | * v6 tunnel - will just use a&a now. | ||
* A&A v6 | * A&A v6 |
Latest revision as of 15:31, 28 February 2014
This page is old! For the continuing refurbishment of the space, see 447_Hackney_Road/Improvements
Simple tasks that you can do right now
- Clean under the windows
- Clean windows in
- The quiet room
The main areaThe classroom
- Fit the projector screen on the far classroom wall (opposite the door) needs brackets making (accurate welding + metal forming), also very heavy will need more then one person.
- Fit the skirting board in the quiet room
Tidy the quiet room into a quiet room rather than a bomb site - should wait for the network cables to be done.Move books from the back room next to the back door to the bookshelves- Move electronics gear from the back room to the electronics area
Fix lightbulbs in all the toiletsAll are normal BC fittings, apart from tube over basin in shower
Clean the kitchen- could do with paintingand more shelves- Assemble all tables in the main room, and put them to one side, or in desk clusters
Empty the storage room next to the downstairs fire exit so we can store things in it. The blue foam can be put in the skip.- Collect the downstairs wood-pile into one place out of the way
- Go through member boxes separating out boxes that are full of general equipment and do not belong to members, placing them on separate shelves that are clearly marked
Take up the remainder of the wooden floor downstairsON HOLDCollect all the rubbish in the car-park and put it in the binLitter picker and binbag just by doorbot inside
Move the bins to the far end of the car park- Clear the rubbish that has been shoved down the side of the wall in the car park (next to the front door)
- Replace the bulbs in the car-park floodlights - which ones, iirc they work? maybe you mean the loading bay?
- The one above the loading bay and the two to the left of it work according to sol, that leaves just the one to the right of the doorbot door. Talk of replacing it with a super-led thing?
Clear out and paint the entrance hall- carpet is a bit nasty.- Paint the sign above the front entrance so it doesn't look horrible
- Make a london hackspace sign for the back gate
Ground Floor
Classroom
- fit
powerandnetwork socketsin the new walls. Network sockets done and gigabit certified. - finish new walls.
lift and fix broken bits of floorwill probably need the shelving removed
- finish a few trunking bits
- fit skirting board
fit access point to ceiling - needs to wait for paint to drypaint walls - almost done!- fit doors
Lobby
fix doorbelldone!wire up a doorbot and the doorbell and bellpush etc.
Elsewhere
- more network sockets
- more power sockets
- clean under windows. - 1/4 done
quiet room
run network to basementfit access point.move shelves- paint walls
- clean windows
replace damaged flooring- need to re-attach skirting board.
Back door area
fix doorlock (please!).- finish some trunking bits.
- needs cctv sorting first
finish boxing in doorbot.
Basement
- wire phone line to upstairs
- fire escape: fix vent, fit push bar.
Workshop
Filler wallsPaint metal shop floorSand walls - ThursdayPaint walls - ThursdayClad miniworkshop walls - FridayPut up power/network trunking - Friday- Place tools - Saturday
Place sockets/run cable - Saturday/Sunday- Run extraction to tools
- Automate filtration
- Run plumbing to workshop sink/biolab
biohacker room
- power sockets
internets
fttcconfig an access pointtest itclone config to other ap'smount access points tidly
Post Move
This is a list of things that arn't vital to the space function but need to get done
Ground floor
- LOTS OF TIDYING
- Install a hood over the roller shutter door so there's no gap to the outside at the top when closed
Classroom
- Fit projector screen
- Fit projector
- Led board
Scrub paint from floors
elsewhere
lasercutter
Lobby Area
- signage
basement
- Led board
car park
We need an ashtray for the yard
Internets
fit and fix the bandwidth meter- really needs more sockets and babbage being moved.spacefed?- v6 tunnel - will just use a&a now.
- A&A v6
- bufferbloat kernel and tuning
- bandwidth management of some kind.