Difference between revisions of "Brewing"

From London Hackspace Wiki
Jump to navigation Jump to search
 
(60 intermediate revisions by 3 users not shown)
Line 2: Line 2:
  
 
[[File:LHS_barrel2.svg|200px|thumb|right]]
 
[[File:LHS_barrel2.svg|200px|thumb|right]]
== London Hackspace Brewing ==
 
  
A successful inaugural brewing session was held at the new Hackspace on the [[2013_August_Open_Day]].
+
London Hackspace had an active homebrewing subgroup at the old Hackney rd location. We still have a shared full-mash gas-fired brewing setup which is capable of a brew length of about 80 litres, as well as a CO2 keg dispense system. Anyone can participate, even if you've had no experience before, there's always cleaning to be done. :)
  
Brewing as a "project" is being driven by [[User:Detonate|Det]], helped by [[User:Ross|Ross]], overseen by [[User:Russ|Russ]] with equipment borrowed from [[User:B3cft|B3cft]].
+
Since our brewing equipment is gas-fired and the space isn't well suited to the steam produced, we brew outside on the loading dock. This is more pleasant in the summer than in the winter.
  
Anyone can participate, even if you've had no experience before, there's always cleaning to be done. :)
+
Brewing as a "project" was driven by [[User:Detonate|Det]], helped by [[User:Ross|Ross]], overseen by [[User:Russ|Russ]] with equipment borrowed from [[User:B3cft|B3cft]].
Subscribe to the [https://groups.google.com/forum/#!forum/london-hackspace-brewing Brewing sub-group] and say hello.
 
  
Once we get settled we shall schedule some regular brewing sessions and will make sure that they're on the calendar and publicised.
+
== Get in touch ==
 
+
A public [https://groups.google.com/forum/#!forum/london-hackspace-brewing Google sub-group] exists for planning brewdays, discussing recipes and the like. Other topics that affect the Space as a whole should be done on the main mailing list.
 
 
== Contacts: ==
 
A public [https://groups.google.com/forum/#!forum/london-hackspace-brewing Google sub-group] exists for planning brewdays, discussing recipes and the like.
 
 
 
Other topics that affect the Space as a whole should be done on the main mailing list.
 
 
 
 
 
== Planned Brewdays: ==
 
{|
 
!align="left"|Date
 
!align="left"|Time
 
!align="left"|Organiser(s)
 
!align="left"|Beer
 
|-
 
|08/09/13
 
|1200hrs
 
|[[User:Detonate|Det]]
 
|LAB Speciality Malt Challenge (Biscuit)
 
|-
 
|14/09/13
 
|
 
|[[User:Dr Thrax|Ross]]
 
| Morgans Best (almost) I1
 
|-
 
|}
 
 
 
== Location: ==
 
Brewing will take place outside on or in front of the loading dock for various reasons, namely ventilation and easy access to running water.
 
 
 
As there's no fixed hose fitting that we've found, we'll be clamping a hose on to the bathroom tap just inside the roller door.  This is used for the immersion chiller whilst cooling the wort.  Thankfully there's also a drain below the loading dock.
 
  
 +
IRC: #london-hack-space-brewing on [http://freenode.net Freenode]
  
 
== Equipment ==
 
== Equipment ==
Line 51: Line 20:
  
 
'''Full list of brewing equipment at the Hackspace:'''
 
'''Full list of brewing equipment at the Hackspace:'''
{|
+
{| class="wikitable"
 
!align="left"|Item
 
!align="left"|Item
 
!align="left"|Quantity
 
!align="left"|Quantity
 
!align="left"|Owner
 
!align="left"|Owner
 
!align="left"|Notes
 
!align="left"|Notes
 +
|-
 +
|[[100L_Kettle|100L Kettle]]
 +
|1x
 +
|Hackspace [[Pledge:100L_Stainless_Pot|pledged]]
 +
|incl. hop filter & ball valve
 
|-
 
|-
 
|[[Gas_Burner|Gas burner]]
 
|[[Gas_Burner|Gas burner]]
Line 83: Line 57:
 
|[[User:Detonate|Det]]
 
|[[User:Detonate|Det]]
 
|Good for HLT. Element needs regular cleaning to prevent gunking up the thermostat
 
|Good for HLT. Element needs regular cleaning to prevent gunking up the thermostat
 +
|-
 +
|60L fermenting vessels
 +
|3x
 +
|Hackspace
 +
|
 
|-
 
|-
 
|25L fermenting vessels
 
|25L fermenting vessels
Line 120: Line 99:
 
|1x
 
|1x
 
|Ross
 
|Ross
 +
|-
 +
|[[brewbot]]
 +
|1x
 +
|[[User:Detonate|Det]]
 +
|2x temp probes & thermowells for the FVs
 +
|-
 +
|Silicon hoses & Quick Connects
 +
|
 +
|Hackspace [[Pledge: Brewing_Pump_and_Piping|pledged]]
 +
|
 
|-
 
|-
 
|}
 
|}
Line 126: Line 115:
  
 
'''Brewing equipment available but not at the Hackspace:'''
 
'''Brewing equipment available but not at the Hackspace:'''
{|
+
{| class="wikitable"
 
!align="left"|Item
 
!align="left"|Item
 
!align="left"|Qty if >1
 
!align="left"|Qty if >1
Line 144: Line 133:
 
* [[Brewing/Recipes|Recipes]]
 
* [[Brewing/Recipes|Recipes]]
 
* [[Brewing/Potential_beer_names|Potential beer names]]
 
* [[Brewing/Potential_beer_names|Potential beer names]]
 +
  
 
== Consumables ==  
 
== Consumables ==  
Line 151: Line 141:
 
Gas bottle refills can be obtained from: http://www.londongases.co.uk/lgcalor.php  They'll deliver and take away the empty for £32.50.
 
Gas bottle refills can be obtained from: http://www.londongases.co.uk/lgcalor.php  They'll deliver and take away the empty for £32.50.
  
We currently have 2x 13kg propane tanks, with a standard 27mm screw-in regulator.  Please make sure there is always one full.
+
We currently have 2x 13kg propane tanks, both with standard 27mm screw-in regulator.  Please make sure there is always one full.
 
If one runs out and you start the new one, send an email to the [https://groups.google.com/forum/#!forum/london-hackspace-brewing LHS Brewing group] to let us know, and perhaps start a pledge for a refill.
 
If one runs out and you start the new one, send an email to the [https://groups.google.com/forum/#!forum/london-hackspace-brewing LHS Brewing group] to let us know, and perhaps start a pledge for a refill.
 +
 +
 +
=== Gas status: ===
 +
*13kg - Full
 +
*13kg - 4.5kg (35%) remaining
 +
 +
The tare (empty) weight of a 13kg propane cylinder is 11kg.
  
 
== Water ==  
 
== Water ==  
Local water composition for Bethnal Green from [http://secure.thameswater.co.uk/water-quality-reports/2012%20WQ%20Report_Z0009_bethnal%20green.pdf Thames Water Quality Report 2012]:
+
Water analysis by Murphy's Homebrew from a sample taken on 22/03/2014, and from the [http://secure.thameswater.co.uk/water-quality-reports/2012%20WQ%20Report_Z0009_bethnal%20green.pdf Thames Water Quality Report 2012]:
  
{|
+
{| class="wikitable"
 +
!align="left"|pH
 
!align="left"|CaCO3
 
!align="left"|CaCO3
 
!align="left"|Calcium(Ca)
 
!align="left"|Calcium(Ca)
 
!align="left"|Magnesium(Mg)
 
!align="left"|Magnesium(Mg)
 
!align="left"|Sulphate(SO4)  
 
!align="left"|Sulphate(SO4)  
 +
!align="left"|Nitrate(NO3)
 
!align="left"|Sodium(Na)
 
!align="left"|Sodium(Na)
 
!align="left"|Chloride(Cl)
 
!align="left"|Chloride(Cl)
 
!align="left"|Fluoride(F)
 
!align="left"|Fluoride(F)
 
|-
 
|-
|280.2mg/l
+
|7.14
|??
+
|211mg/l
|??
+
|89mg/l
|57.3mg/l
+
|5mg/l
 +
|48.27mg/l
 +
|25.2mg/l
 
|39.9mg/l
 
|39.9mg/l
|55.4mg/l
+
|43.5mg/l
 
|0.18mg/l
 
|0.18mg/l
 
|-
 
|-
 
|}
 
|}
 +
 +
 +
 +
[http://www.jimsbeerkit.co.uk/water.html Liquor Treatment Calculator]
  
 
== Projects ==
 
== Projects ==
  
{|
+
===In Progress===
 +
{| class="wikitable"
 
!align="left"|Project
 
!align="left"|Project
 
!align="left"|Description
 
!align="left"|Description
Line 184: Line 190:
 
!align="left"|Status
 
!align="left"|Status
 
|-
 
|-
|Temp Monitoring
+
|Realtime Beer Stats
|Internettable graphs of the temp in the gimp closet
+
|Build a [http://kegbot.org Kegbot] system
|Simon
 
|Has the gear, needs to hack.
 
|-
 
|Sparge Arm
 
|Build a copper fly sparge arm. Doesn't have to be a rotating one
 
 
|[[User:Detonate|Det]]
 
|[[User:Detonate|Det]]
|Not started
+
|The Kegbot board has arrived, need to wire up our existing [http://www.drinkbrook.co.uk/Pages/dbs0265.html flowmeters].
 
|-
 
|-
|Temp Controlled Fermenting
+
|}
|Build a temperature controlled fridge/area for fermenting. Can we somehow build it into the brewing closet?
+
 
|Up for grabs
+
===Up For Grabs===
|N/A
+
{| class="wikitable"
 +
!align="left"|Project
 +
!align="left"|Description
 +
!align="left"|Owner
 +
!align="left"|Status
 
|-
 
|-
|Hose
+
|Sparge Arm
|Install an outdoor hose tap. eg. http://www.youtube.com/watch?v=2XxJJKof2OQ & http://goo.gl/co3tWc
+
|Build a better fly sparge arm. Doesn't have to be a rotating one
 
|Up for grabs
 
|Up for grabs
|Requires buying the kit and a volunteer.
+
|Worth doing?  We do already have a little fly sparge arm that can be hacked.
 
|-
 
|-
 
|Spent Grain
 
|Spent Grain
Line 208: Line 213:
 
|Up for grabs
 
|Up for grabs
 
|
 
|
 +
|-
 +
|Chiller
 +
|Build a cooling chamber or something
 +
|Up for grabs
 +
|http://forum.brewpi.com/discussion/116/diy-fermentation-chamber-from-used-fridge
 +
|-
 +
|}
 +
 +
===Completed===
 +
{| class="wikitable"
 +
!align="left"|Project
 +
!align="left"|Description
 +
!align="left"|Owner
 +
!align="left"|Status
 +
|-
 +
|[http://brewpi.com BrewPi]
 +
|Temperature controller/grapher/etc.
 +
|[[User:Detonate|Det]]
 +
|[[brewbot]] complete.  Still yet to hook up the solid state relays to anything.
 +
|-
 +
|Hose Tap
 +
|Install an outdoor hose tap. eg. http://www.youtube.com/watch?v=2XxJJKof2OQ & http://goo.gl/co3tWc
 +
|Up for grabs
 +
|Done, thanks Paddy & tgreer
 +
|-
 +
|}
 +
 +
 +
===Dead===
 +
{| class="wikitable"
 +
!align="left"|Project
 +
!align="left"|Description
 +
!align="left"|Owner
 +
!align="left"|Status
 +
|-
 +
|Realtime Beer Stats
 +
|Hack the Wii Balance Board to weigh the cornies in the kegerator
 +
|[[User:Detonate|Det]]
 +
|One of the 4 sensors is a bit derpy, meaning depending on where the keg is placed on the platform, a different reading is produced.  Haven't thought of a work around as yet.
 
|-
 
|-
 
|}
 
|}
Line 217: Line 261:
 
'''Current Pledges'''
 
'''Current Pledges'''
  
* [[Pledge:100L_Stainless_Pot|100L Stainless pot]]
+
* [[Pledge:_Brewing_Pump_and_Piping|Hosing and pump]]
 +
* [[Pledge:_Rotary_Attachment_for_Laser_Cutter|Lasercutter attachment to etch pint glassses]]
  
 
'''Completed Pledges'''
 
'''Completed Pledges'''
  
 
* [[Pledge:_2nd_Propane_Tank|<strike>2nd (full) propane tank</strike>]]
 
* [[Pledge:_2nd_Propane_Tank|<strike>2nd (full) propane tank</strike>]]
 +
* [[Pledge:100L_Stainless_Pot|<strike>100L Stainless pot</strike>]]
  
 
== Logo ==
 
== Logo ==
Line 234: Line 280:
 
|[[File:LHS_barrel2_tap.svg]]
 
|[[File:LHS_barrel2_tap.svg]]
 
|}
 
|}
 
 
== Other ==
 
 
See [[HomeBrew]] for other info and older discussions about brewing at the Space.
 

Latest revision as of 12:44, 24 January 2022

Brewing.jpg
LHS barrel2.svg

London Hackspace had an active homebrewing subgroup at the old Hackney rd location. We still have a shared full-mash gas-fired brewing setup which is capable of a brew length of about 80 litres, as well as a CO2 keg dispense system. Anyone can participate, even if you've had no experience before, there's always cleaning to be done. :)

Since our brewing equipment is gas-fired and the space isn't well suited to the steam produced, we brew outside on the loading dock. This is more pleasant in the summer than in the winter.

Brewing as a "project" was driven by Det, helped by Ross, overseen by Russ with equipment borrowed from B3cft.

Get in touch

A public Google sub-group exists for planning brewdays, discussing recipes and the like. Other topics that affect the Space as a whole should be done on the main mailing list.

IRC: #london-hack-space-brewing on Freenode

Equipment

B3cft has kindly loaned the space his setup The kit is to be considered Hackspace infrastructure and is not to be hacked, but can be used with respect. As always, please clean up after yourselves, and return the equipment to where you found it. (Mention the permanent location of the kit here)


Full list of brewing equipment at the Hackspace:

Item Quantity Owner Notes
100L Kettle 1x Hackspace pledged incl. hop filter & ball valve
Gas burner 1x B3cft
High pressure gas regulator 1x B3cft Replaced the perished hose, but could do with a longer one.
13kg Propane tank 2x B3cft & Hackspace (hired)
80L Stainless mash tun 1x B3cft
Converted keg kettle 1x B3cft
29L Brupak Electric Boiler 1x Det Good for HLT. Element needs regular cleaning to prevent gunking up the thermostat
60L fermenting vessels 3x Hackspace
25L fermenting vessels 4x Det & Ross All complete with bungs & airlocks
19L Cornies 8x B3cft Some require servicing. (perished o-rings, dodgy quick release valves, etc.)
Cornie taps & connectors 3x pairs (?) B3cft Gas & Liquid pair (Gray = gas, Black = liquid)
Copper immersion chiller 1x B3cft
Hose and fittings 25m Hackspace (Bathroom tap adapter and hose connector)
Refractometer 1x B3cft
Brew belt 1x Ross
Thermometer & Hydrometer 1x Ross
brewbot 1x Det 2x temp probes & thermowells for the FVs
Silicon hoses & Quick Connects Hackspace pledged


Brewing equipment available but not at the Hackspace:

Item Qty if >1 Owner Notes
Mash tun (25L) 2 Ross & Det

Beers


Consumables

See this sub-page for a current stock list.

Gas bottle refills can be obtained from: http://www.londongases.co.uk/lgcalor.php They'll deliver and take away the empty for £32.50.

We currently have 2x 13kg propane tanks, both with standard 27mm screw-in regulator. Please make sure there is always one full. If one runs out and you start the new one, send an email to the LHS Brewing group to let us know, and perhaps start a pledge for a refill.


Gas status:

  • 13kg - Full
  • 13kg - 4.5kg (35%) remaining

The tare (empty) weight of a 13kg propane cylinder is 11kg.

Water

Water analysis by Murphy's Homebrew from a sample taken on 22/03/2014, and from the Thames Water Quality Report 2012:

pH CaCO3 Calcium(Ca) Magnesium(Mg) Sulphate(SO4) Nitrate(NO3) Sodium(Na) Chloride(Cl) Fluoride(F)
7.14 211mg/l 89mg/l 5mg/l 48.27mg/l 25.2mg/l 39.9mg/l 43.5mg/l 0.18mg/l


Liquor Treatment Calculator

Projects

In Progress

Project Description Owner Status
Realtime Beer Stats Build a Kegbot system Det The Kegbot board has arrived, need to wire up our existing flowmeters.

Up For Grabs

Project Description Owner Status
Sparge Arm Build a better fly sparge arm. Doesn't have to be a rotating one Up for grabs Worth doing? We do already have a little fly sparge arm that can be hacked.
Spent Grain Find something to do with the spent grain Up for grabs
Chiller Build a cooling chamber or something Up for grabs http://forum.brewpi.com/discussion/116/diy-fermentation-chamber-from-used-fridge

Completed

Project Description Owner Status
BrewPi Temperature controller/grapher/etc. Det brewbot complete. Still yet to hook up the solid state relays to anything.
Hose Tap Install an outdoor hose tap. eg. http://www.youtube.com/watch?v=2XxJJKof2OQ & http://goo.gl/co3tWc Up for grabs Done, thanks Paddy & tgreer


Dead

Project Description Owner Status
Realtime Beer Stats Hack the Wii Balance Board to weigh the cornies in the kegerator Det One of the 4 sensors is a bit derpy, meaning depending on where the keg is placed on the platform, a different reading is produced. Haven't thought of a work around as yet.

Pledges

From time to time we need to buy new things, be it consumables like propane, or new kit like a new boil kettle.

Current Pledges

Completed Pledges

Some suggested logos for the group

LHS barrel.svg LHS barrel pump.svg LHS barrel2.svg LHS barrel2 pump.svg LHS barrel2 tap.svg