* power and network sockets in walls
* power and network sockets in walls
* run cables to access points (on ceiling).
* run cables to access points (on ceiling).
* paint walls
* paint walls -- this seems non-critical, and given the amount of other stuff we have to do, I propose leaving it until after the move.
* <s>clean floor</s>
* <s>clean floor</s>
* <s>paint floor</s>
* <s>paint floor</s>

Revision as of 13:59, 10 April 2013

ground floor

class room

  • fit power and network sockets in the new walls
  • finish new walls.
  • lift and fix broken bits of floor
    • will probably need the shelving removed
  • finish a few trunking bits
  • fit access point to ceiling
  • paint walls:
    • what colour? plain matt white?

elsewhere

  • more network sockets
  • more power sockets
  • clean under windows. - 1/4 done

quiet room

  • run network to basement
  • fit access point.
  • move shelves
  • paint walls? (they are a bit manky atm)

back door area

  • fix doorlock (please!).
  • finish some trunking bits.
  • finish boxing in doorbot.

basement

  • fix heating.
  • run and fit power
  • run network down from the ground floor - 8 cables
  • finish rockwooling
  • finish walls
    • fit air filters
  • power and network sockets in walls
  • run cables to access points (on ceiling).
  • paint walls -- this seems non-critical, and given the amount of other stuff we have to do, I propose leaving it until after the move.
  • clean floor
  • paint floor

biohacker room

  • power sockets? (not critical? - but they will need a fridge from day one?).

internets

  • fttc
  • config an access point
    • test it
    • clone config to other ap's