Difference between revisions of "Pledge: Basement plumbing"

From London Hackspace Wiki
Jump to navigation Jump to search
Line 35: Line 35:
 
* £25 - [[User:Flux|Flux]] ([[User talk:Flux|talk]])
 
* £25 - [[User:Flux|Flux]] ([[User talk:Flux|talk]])
 
* £25 - [[User:Fuxy|Fuxy]]
 
* £25 - [[User:Fuxy|Fuxy]]
 +
* £25 - [[User:Ms7821|Mark]]
  
 
Provisional pledges from mailing list
 
Provisional pledges from mailing list
Line 42: Line 43:
  
  
Running total: '''£775'''
+
Running total: '''£800'''
  
 
Target: '''£800'''
 
Target: '''£800'''
  
 
[[Category:Pledges]]
 
[[Category:Pledges]]

Revision as of 12:34, 1 October 2013


Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013

Pledge leader: Will

The items

  • A pump to push waste water upstairs to main drain pipe.
  • Inflow and drainage pipes.

We should then have

  • Sink in the main workshop area with HOT WATER!
  • 1 Sink in PCB/darkroom area
  • working PCB etching tank
  • Sink in the Biolab

Budget estimation

  • £800. (£590 for pump, rest on pipes. )

Pledge name for payment

  • PLUMBING

Pledges

Provisional pledges from mailing list


Running total: £800

Target: £800