538
edits
(→Tools: Wembley deployment) |
(→Tools) |
||
| Line 139: | Line 139: | ||
| box in ground floor CNC room with gel cell battery backup, acnode-shield v1 | | box in ground floor CNC room with gel cell battery backup, acnode-shield v1 | ||
| | | | ||
| In service testing, bugs with acnode vlan? | | In service testing, bugs with acnode vlan? Configured for Normally Open solenoid | ||
|- | |- | ||
| Front door, actually for lift lobby to 1st floor | | Front door, actually for lift lobby to 1st floor | ||
| Line 148: | Line 148: | ||
| box to be installed in 1st floor comms room, gel cell battery backup, acnode-sheild v1 | | box to be installed in 1st floor comms room, gel cell battery backup, acnode-sheild v1 | ||
| | | | ||
| in construction, requires gel cell for battery backup | | in construction, requires gel cell for battery backup. Configured for Normally Closed maglock | ||
|} | |} | ||
edits