Pledge: Basement plumbing: Difference between revisions

From London Hackspace Wiki
No edit summary
No edit summary
Line 30: Line 30:
* £10 - [[User:Rob Kam|Rob Kam]]
* £10 - [[User:Rob Kam|Rob Kam]]
* £25 - [[User:Oni|Oni]]
* £25 - [[User:Oni|Oni]]
* £25 - [[Iser:wyan|wyan]]


Running total: '''£585'''
Running total: '''£610'''


Target: '''£800'''
Target: '''£800'''


[[Category:Pledges]]
[[Category:Pledges]]

Revision as of 11:13, 1 October 2013


Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013

Pledge leader: Will

The items

  • A pump to push waste water upstairs to main drain pipe.
  • Inflow and drainage pipes.

We should then have

  • Sink in the main workshop area with HOT WATER!
  • 1 Sink in PCB/darkroom area
  • working PCB etching tank
  • Sink in the Biolab


Budget estimation

  • £800. (£590 for pump, rest on pipes. )

Pledges

Running total: £610

Target: £800