Pledge: Basement plumbing: Difference between revisions

From London Hackspace Wiki
mNo edit summary
No edit summary
Line 40: Line 40:




Running total: '''£625'''
Running total: '''£725'''


Target: '''£800'''
Target: '''£800'''


[[Category:Pledges]]
[[Category:Pledges]]

Revision as of 12:13, 1 October 2013


Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013

Pledge leader: Will

The items

  • A pump to push waste water upstairs to main drain pipe.
  • Inflow and drainage pipes.

We should then have

  • Sink in the main workshop area with HOT WATER!
  • 1 Sink in PCB/darkroom area
  • working PCB etching tank
  • Sink in the Biolab

Budget estimation

  • £800. (£590 for pump, rest on pipes. )

Pledge name for payment

  • PLUMBING

Pledges

Provisional pledges from mailing list

  • £50 alphacabbage1 (is donating directly with bank transfer)
  • £50 ܔܢܜܔηιηℓιℓιzιܔܢܜܔ‎ ( is a conditional donation)


Running total: £725

Target: £800