Pledge: Basement plumbing: Difference between revisions

From London Hackspace Wiki
No edit summary
No edit summary
Line 24: Line 24:
==Pledges==
==Pledges==
* £400 -- Biohackers
* £400 -- Biohackers
* £50 - Tom Hodder
*<s>£50 - [[User:Tolland]] </s>'''PAID'''
* £25 - [[User:JasperWallace]]
* £25 - [[User:JasperWallace]]
* £25 - [[User:Billy Smith]]
* £25 - [[User:Billy Smith]]
Line 47: Line 47:
Target: '''£800'''
Target: '''£800'''


Paid: '''£100'''
Paid: '''£150'''


[[Category:Pledges]]
[[Category:Pledges]]

Revision as of 13:52, 2 October 2013


Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013

Pledge leader: Will

The items

  • A pump to push waste water upstairs to main drain pipe.
  • Inflow and drainage pipes.

We should then have

  • Sink in the main workshop area with HOT WATER!
  • 1 Sink in PCB/darkroom area
  • working PCB etching tank
  • Sink in the Biolab

Budget estimation

  • £800. (£590 for pump, rest on pipes. )

Pledge name for payment

  • PLUMBING

Pledges

Provisional pledges from mailing list


Running total: £800

Target: £800

Paid: £150