Pledge: Basement plumbing: Difference between revisions

From London Hackspace Wiki
No edit summary
No edit summary
Line 33: Line 33:
* £25 - [[Iser:wyan|wyan]]
* £25 - [[Iser:wyan|wyan]]
* £15 - [[User:Xianic|Xianic]]
* £15 - [[User:Xianic|Xianic]]
* £25 - [[User:Flux|Flux]] ([[User talk:Flux|talk]])
* <s>£25 - [[User:Flux|Flux]] ([[User talk:Flux|talk]])</s> '''PAID'''
* £25 - [[User:Fuxy|Fuxy]]
* £25 - [[User:Fuxy|Fuxy]]
* <s>£25 - [[User:Ms7821|Mark]]</s> '''PAID'''
* <s>£25 - [[User:Ms7821|Mark]]</s> '''PAID'''
Line 47: Line 47:
Target: '''£800'''
Target: '''£800'''


Paid: '''£575'''
Paid: '''£600'''


[[Category:Pledges]]
[[Category:Pledges]]

Revision as of 08:49, 7 October 2013


Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013

Pledge leader: Will

The items

  • A pump to push waste water upstairs to main drain pipe.
  • Inflow and drainage pipes.

We should then have

  • Sink in the main workshop area with HOT WATER!
  • 1 Sink in PCB/darkroom area
  • working PCB etching tank
  • Sink in the Biolab

Budget estimation

  • £800. (£590 for pump, rest on pipes. )

Pledge name for payment

  • PLUMBING

Pledges

Provisional pledges from mailing list


Running total: £800

Target: £800

Paid: £600