A number of key activities and the people coordinating them. '''Highlighted*''' projects have been identified as critical: they are prerequisites for other work, or they establish what we can initially do at the space.  
A number of key activities and the people coordinating them. '''Highlighted*''' projects have been identified as critical: they are prerequisites for other work, or they establish what we can initially do at the space.  
'''Important:''' project statuses are not authoritative.  Please speak to the project contact to find out what the current state is.


== Hackney Rd, basic infrastructure ==
== Hackney Rd, basic infrastructure ==
Line 5: Line 7:
* '''[[447_Hackney_Road/Ventilation|Ventilation]]*''': Paddy, Steve, Charles
* '''[[447_Hackney_Road/Ventilation|Ventilation]]*''': Paddy, Steve, Charles
* '''Lift*''': Thomas/tgreer
* '''Lift*''': Thomas/tgreer
**<s> Get a lift engineer out to verify that the lift really is safe to use and place heavy loads in.  </s>Insurance issues still to be addressed
* '''Power*''': alisonw (Charles - workshop)
* '''Power*''': alisonw (Charles - workshop)
* Door access: Mark/ms7821, tgreer
* <s>Door access: Mark/ms7821, tgreer
** Doorbot is installed.  Trustees have override keys.
** And at old space.</s>
* Comms: Jasper, Thomas/tgreer ([[447_Hackney_Road/Networking]])
* Comms: Jasper, Thomas/tgreer ([[447_Hackney_Road/Networking]])
** <s>Phone lines are connected by still being paid for, so we can't take them over.  New line will be fitted 27/3/2013</s> phone line now live
** <s>FTTC internet ordered from Zen - will be done next week, Weds 10th AM.</s> done
* Waste: Jasper
* Waste: Jasper
* (Drainage)
* (Drainage)
Line 18: Line 25:
== Hackney Rd, functional areas ==
== Hackney Rd, functional areas ==
* Workshop: Charles/solexious
* Workshop: Charles/solexious
** Floor has received first coat of paint!  (Excepting the dirty metalworking room, to be done later)
** Walls are constructed for woodworking and dirty metalworking rooms.
* Wetlab: Will/will-h, biohackers
* Wetlab: Will/will-h, biohackers
* [[Hackspace_Move/Electronics|Electronics(incl EtchTank)]]: Eugene/mentar
* [[Hackspace_Move/Electronics|Electronics(incl EtchTank)]]: Eugene/mentar
Line 29: Line 38:
* Cleanup
* Cleanup
* Packing
* Packing
* Restoration
** Kitchen, quiet room: Marc B.
** Workshop: (Duffy?)
** Social area:
** Lobby area:
* Agree on Cremer St restoration with landlord
* [[Hackspace_Move/Cremer_Restoration|Restoration]]
 
Our Cremer Street lease ends on the '''30th April'''.


== The actual move ==
== The actual move ==
[[Hackspace_Move/RegisterToHelp | Register to help out!]]
* Loading:
* Loading:
* Transport: Thomas/tgreer
* Transport: Thomas/tgreer
* Unloading: Sam/Eithin
* Unloading: Sam/Eithin
* Set-up:
* Set-up:  
* '''Deadline: 13th/14th April'''
 
== PHASE X: Not Time Critical ==
 
* organise water & gas
 
[[Category:Moving_Space]]

Latest revision as of 20:56, 20 May 2013

A number of key activities and the people coordinating them. Highlighted* projects have been identified as critical: they are prerequisites for other work, or they establish what we can initially do at the space.

Important: project statuses are not authoritative. Please speak to the project contact to find out what the current state is.

Hackney Rd, basic infrastructure

  • Walls*: Paddy, Steve (Charles - workshop)
  • Ventilation*: Paddy, Steve, Charles
  • Lift*: Thomas/tgreer
    • Get a lift engineer out to verify that the lift really is safe to use and place heavy loads in. Insurance issues still to be addressed
  • Power*: alisonw (Charles - workshop)
  • Door access: Mark/ms7821, tgreer
    • Doorbot is installed. Trustees have override keys.
    • And at old space.
  • Comms: Jasper, Thomas/tgreer (447_Hackney_Road/Networking)
    • Phone lines are connected by still being paid for, so we can't take them over. New line will be fitted 27/3/2013 phone line now live
    • FTTC internet ordered from Zen - will be done next week, Weds 10th AM. done
  • Waste: Jasper
  • (Drainage)
  • (Flooring)

Hackney Rd, legal/regulations

  • Fire safety (exits, extinguishers, lighting, etc): Russ
  • Accessibility:

Hackney Rd, functional areas

  • Workshop: Charles/solexious
    • Floor has received first coat of paint! (Excepting the dirty metalworking room, to be done later)
    • Walls are constructed for woodworking and dirty metalworking rooms.
  • Wetlab: Will/will-h, biohackers
  • Electronics(incl EtchTank): Eugene/mentar
  • Darkroom: wyan
  • "Music" or performance space (actual form tbd)
  • Classroom
  • Storage, shelves

Cremer St

  • Pre-move (early removal of excess kit to 447 or give away): Thomas/tgreer
  • Cleanup
  • Packing
    • Kitchen, quiet room: Marc B.
    • Workshop: (Duffy?)
    • Social area:
    • Lobby area:
  • Agree on Cremer St restoration with landlord
  • Restoration

Our Cremer Street lease ends on the 30th April.

The actual move

Register to help out!

  • Loading:
  • Transport: Thomas/tgreer
  • Unloading: Sam/Eithin
  • Set-up:
  • Deadline: 13th/14th April

PHASE X: Not Time Critical