A number of key activities and the people coordinating them. '''Highlighted*''' projects have been identified as critical: they are prerequisites for other work, or they establish what we can initially do at the space. | A number of key activities and the people coordinating them. '''Highlighted*''' projects have been identified as critical: they are prerequisites for other work, or they establish what we can initially do at the space. | ||
+ | |||
+ | '''Important:''' project statuses are not authoritative. Please speak to the project contact to find out what the current state is. | ||
== Hackney Rd, basic infrastructure == | == Hackney Rd, basic infrastructure == | ||
Line 5: | Line 7: | ||
* '''[[447_Hackney_Road/Ventilation|Ventilation]]*''': Paddy, Steve, Charles | * '''[[447_Hackney_Road/Ventilation|Ventilation]]*''': Paddy, Steve, Charles | ||
* '''Lift*''': Thomas/tgreer | * '''Lift*''': Thomas/tgreer | ||
+ | **<s> Get a lift engineer out to verify that the lift really is safe to use and place heavy loads in. </s>Insurance issues still to be addressed | ||
* '''Power*''': alisonw (Charles - workshop) | * '''Power*''': alisonw (Charles - workshop) | ||
− | * Door access: Mark/ms7821, tgreer | + | * <s>Door access: Mark/ms7821, tgreer |
+ | ** Doorbot is installed. Trustees have override keys. | ||
+ | ** And at old space.</s> | ||
* Comms: Jasper, Thomas/tgreer ([[447_Hackney_Road/Networking]]) | * Comms: Jasper, Thomas/tgreer ([[447_Hackney_Road/Networking]]) | ||
+ | ** <s>Phone lines are connected by still being paid for, so we can't take them over. New line will be fitted 27/3/2013</s> phone line now live | ||
+ | ** <s>FTTC internet ordered from Zen - will be done next week, Weds 10th AM.</s> done | ||
* Waste: Jasper | * Waste: Jasper | ||
* (Drainage) | * (Drainage) | ||
Line 18: | Line 25: | ||
== Hackney Rd, functional areas == | == Hackney Rd, functional areas == | ||
* Workshop: Charles/solexious | * Workshop: Charles/solexious | ||
+ | ** Floor has received first coat of paint! (Excepting the dirty metalworking room, to be done later) | ||
+ | ** Walls are constructed for woodworking and dirty metalworking rooms. | ||
* Wetlab: Will/will-h, biohackers | * Wetlab: Will/will-h, biohackers | ||
* [[Hackspace_Move/Electronics|Electronics(incl EtchTank)]]: Eugene/mentar | * [[Hackspace_Move/Electronics|Electronics(incl EtchTank)]]: Eugene/mentar | ||
Line 29: | Line 38: | ||
* Cleanup | * Cleanup | ||
* Packing | * Packing | ||
− | * Restoration | + | ** Kitchen, quiet room: Marc B. |
+ | ** Workshop: (Duffy?) | ||
+ | ** Social area: | ||
+ | ** Lobby area: | ||
+ | * Agree on Cremer St restoration with landlord | ||
+ | * [[Hackspace_Move/Cremer_Restoration|Restoration]] | ||
+ | |||
+ | Our Cremer Street lease ends on the '''30th April'''. | ||
== The actual move == | == The actual move == | ||
+ | [[Hackspace_Move/RegisterToHelp | Register to help out!]] | ||
* Loading: | * Loading: | ||
* Transport: Thomas/tgreer | * Transport: Thomas/tgreer | ||
* Unloading: Sam/Eithin | * Unloading: Sam/Eithin | ||
− | * Set-up: | + | * Set-up: |
+ | * '''Deadline: 13th/14th April''' | ||
+ | |||
+ | == PHASE X: Not Time Critical == | ||
+ | |||
+ | * organise water & gas | ||
+ | |||
+ | [[Category:Moving_Space]] |
Latest revision as of 20:56, 20 May 2013
A number of key activities and the people coordinating them. Highlighted* projects have been identified as critical: they are prerequisites for other work, or they establish what we can initially do at the space.
Important: project statuses are not authoritative. Please speak to the project contact to find out what the current state is.
Hackney Rd, basic infrastructure
- Walls*: Paddy, Steve (Charles - workshop)
- Ventilation*: Paddy, Steve, Charles
- Lift*: Thomas/tgreer
Get a lift engineer out to verify that the lift really is safe to use and place heavy loads in.Insurance issues still to be addressed
- Power*: alisonw (Charles - workshop)
Door access: Mark/ms7821, tgreer- Doorbot is installed. Trustees have override keys.
And at old space.
- Comms: Jasper, Thomas/tgreer (447_Hackney_Road/Networking)
Phone lines are connected by still being paid for, so we can't take them over. New line will be fitted 27/3/2013phone line now liveFTTC internet ordered from Zen - will be done next week, Weds 10th AM.done
- Waste: Jasper
- (Drainage)
- (Flooring)
Hackney Rd, legal/regulations
- Fire safety (exits, extinguishers, lighting, etc): Russ
- Accessibility:
Hackney Rd, functional areas
- Workshop: Charles/solexious
- Floor has received first coat of paint! (Excepting the dirty metalworking room, to be done later)
- Walls are constructed for woodworking and dirty metalworking rooms.
- Wetlab: Will/will-h, biohackers
- Electronics(incl EtchTank): Eugene/mentar
- Darkroom: wyan
- "Music" or performance space (actual form tbd)
- Classroom
- Storage, shelves
Cremer St
- Pre-move (early removal of excess kit to 447 or give away): Thomas/tgreer
- Cleanup
- Packing
- Kitchen, quiet room: Marc B.
- Workshop: (Duffy?)
- Social area:
- Lobby area:
- Agree on Cremer St restoration with landlord
- Restoration
Our Cremer Street lease ends on the 30th April.
The actual move
- Loading:
- Transport: Thomas/tgreer
- Unloading: Sam/Eithin
- Set-up:
- Deadline: 13th/14th April
PHASE X: Not Time Critical
- organise water & gas