Difference between revisions of "Hackspace Move/Key Projects"

From London Hackspace Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
A number of key activities and the people coordinating them. '''Highlighted*''' projects have been identified as critical: they are prerequisites for other work, or they establish what we can initially do at the space.  
 
A number of key activities and the people coordinating them. '''Highlighted*''' projects have been identified as critical: they are prerequisites for other work, or they establish what we can initially do at the space.  
 +
 +
'''Important:''' project statuses are not authoritative.  Please speak to the project contact to find out what the current state is.
  
 
== Hackney Rd, basic infrastructure ==
 
== Hackney Rd, basic infrastructure ==
Line 5: Line 7:
 
* '''[[447_Hackney_Road/Ventilation|Ventilation]]*''': Paddy, Steve, Charles
 
* '''[[447_Hackney_Road/Ventilation|Ventilation]]*''': Paddy, Steve, Charles
 
* '''Lift*''': Thomas/tgreer
 
* '''Lift*''': Thomas/tgreer
 +
**<s> Get a lift engineer out to verify that the lift really is safe to use and place heavy loads in.  </s>Insurance issues still to be addressed
 
* '''Power*''': alisonw (Charles - workshop)
 
* '''Power*''': alisonw (Charles - workshop)
 
* Door access: Mark/ms7821, tgreer
 
* Door access: Mark/ms7821, tgreer
 
* Comms: Jasper, Thomas/tgreer ([[447_Hackney_Road/Networking]])
 
* Comms: Jasper, Thomas/tgreer ([[447_Hackney_Road/Networking]])
 +
** Phone lines are connected by still being paid for, so we can't take them over.  New line will be fitted 27/3/2013
 +
** FTTC internet ordered from Zen
 
* Waste: Jasper
 
* Waste: Jasper
 
* (Drainage)
 
* (Drainage)
Line 14: Line 19:
 
== Hackney Rd, legal/regulations ==
 
== Hackney Rd, legal/regulations ==
 
* Fire safety (exits, extinguishers, lighting, etc): Russ
 
* Fire safety (exits, extinguishers, lighting, etc): Russ
 +
** Wall off entire fire exit door in basement?
 
* Accessibility:
 
* Accessibility:
  
Line 29: Line 35:
 
* Cleanup
 
* Cleanup
 
* Packing
 
* Packing
 +
* Agree on Cremer St restoration with landlord
 
* Restoration
 
* Restoration
 +
 +
Our Cremer Street lease ends on the '''30th April'''.
  
 
== The actual move ==
 
== The actual move ==
 +
[[Hackspace_Move/RegisterToHelp | Register to help out!]]
 
* Loading:
 
* Loading:
 
* Transport: Thomas/tgreer
 
* Transport: Thomas/tgreer
 
* Unloading: Sam/Eithin
 
* Unloading: Sam/Eithin
* Set-up:
+
* Set-up:  
 +
* '''Deadline: 13th/14th April'''
 +
 
 +
== PHASE X: Not Time Critical ==
 +
 
 +
* organise water & gas

Revision as of 19:55, 3 April 2013

A number of key activities and the people coordinating them. Highlighted* projects have been identified as critical: they are prerequisites for other work, or they establish what we can initially do at the space.

Important: project statuses are not authoritative. Please speak to the project contact to find out what the current state is.

Hackney Rd, basic infrastructure

  • Walls*: Paddy, Steve (Charles - workshop)
  • Ventilation*: Paddy, Steve, Charles
  • Lift*: Thomas/tgreer
    • Get a lift engineer out to verify that the lift really is safe to use and place heavy loads in. Insurance issues still to be addressed
  • Power*: alisonw (Charles - workshop)
  • Door access: Mark/ms7821, tgreer
  • Comms: Jasper, Thomas/tgreer (447_Hackney_Road/Networking)
    • Phone lines are connected by still being paid for, so we can't take them over. New line will be fitted 27/3/2013
    • FTTC internet ordered from Zen
  • Waste: Jasper
  • (Drainage)
  • (Flooring)

Hackney Rd, legal/regulations

  • Fire safety (exits, extinguishers, lighting, etc): Russ
    • Wall off entire fire exit door in basement?
  • Accessibility:

Hackney Rd, functional areas

  • Workshop: Charles/solexious
  • Wetlab: Will/will-h, biohackers
  • Electronics(incl EtchTank): Eugene/mentar
  • Darkroom: wyan
  • "Music" or performance space (actual form tbd)
  • Classroom
  • Storage, shelves

Cremer St

  • Pre-move (early removal of excess kit to 447 or give away): Thomas/tgreer
  • Cleanup
  • Packing
  • Agree on Cremer St restoration with landlord
  • Restoration

Our Cremer Street lease ends on the 30th April.

The actual move

Register to help out!

  • Loading:
  • Transport: Thomas/tgreer
  • Unloading: Sam/Eithin
  • Set-up:
  • Deadline: 13th/14th April

PHASE X: Not Time Critical

  • organise water & gas