Difference between revisions of "Pledge: Basement plumbing"

From London Hackspace Wiki
Jump to navigation Jump to search
Line 30: Line 30:
 
* £10 - [[User:Rob Kam|Rob Kam]]
 
* £10 - [[User:Rob Kam|Rob Kam]]
 
* £25 - [[User:Oni|Oni]]
 
* £25 - [[User:Oni|Oni]]
 +
* £25 - [[Iser:wyan|wyan]]
  
Running total: '''£585'''
+
Running total: '''£610'''
  
 
Target: '''£800'''
 
Target: '''£800'''
  
 
[[Category:Pledges]]
 
[[Category:Pledges]]

Revision as of 11:13, 1 October 2013


Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013

Pledge leader: Will

The items

  • A pump to push waste water upstairs to main drain pipe.
  • Inflow and drainage pipes.

We should then have

  • Sink in the main workshop area with HOT WATER!
  • 1 Sink in PCB/darkroom area
  • working PCB etching tank
  • Sink in the Biolab


Budget estimation

  • £800. (£590 for pump, rest on pipes. )

Pledges

Running total: £610

Target: £800