Difference between revisions of "Pledge: Basement plumbing"

From London Hackspace Wiki
Jump to navigation Jump to search
Line 23: Line 23:
  
 
==Pledges==
 
==Pledges==
* £400 -- Biohackers
+
* <s>£400 -- Biohackers</s>'''PAID'''
 
*<s>£50 - [[User:Tolland]] </s>'''PAID'''
 
*<s>£50 - [[User:Tolland]] </s>'''PAID'''
 
* £25 - [[User:JasperWallace]]
 
* £25 - [[User:JasperWallace]]
Line 47: Line 47:
 
Target: '''£800'''
 
Target: '''£800'''
  
Paid: '''£150'''
+
Paid: '''£575'''
  
 
[[Category:Pledges]]
 
[[Category:Pledges]]

Revision as of 21:50, 6 October 2013


Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013

Pledge leader: Will

The items

  • A pump to push waste water upstairs to main drain pipe.
  • Inflow and drainage pipes.

We should then have

  • Sink in the main workshop area with HOT WATER!
  • 1 Sink in PCB/darkroom area
  • working PCB etching tank
  • Sink in the Biolab

Budget estimation

  • £800. (£590 for pump, rest on pipes. )

Pledge name for payment

  • PLUMBING

Pledges

Provisional pledges from mailing list


Running total: £800

Target: £800

Paid: £575