Pledge: Basement plumbing: Difference between revisions

From London Hackspace Wiki
No edit summary
mNo edit summary
Line 19: Line 19:
* £750. (£500 for pump and other items, rest on misc, or to be determined if there is excess funds. )
* £750. (£500 for pump and other items, rest on misc, or to be determined if there is excess funds. )


The budget was revised because the items came in cheaper than the original estimate.


===Pledge name for payment===
===Pledge name for payment===

Revision as of 19:56, 13 December 2013


Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013

Pledge leader: Will

The items

  • A pump to push waste water upstairs to main drain pipe.
  • Inflow and drainage pipes.

We should then have

  • Sink in the main workshop area with HOT WATER!
  • 1 Sink in PCB/darkroom area
  • working PCB etching tank
  • Sink in the Biolab

Budget estimation

  • £750. (£500 for pump and other items, rest on misc, or to be determined if there is excess funds. )

The budget was revised because the items came in cheaper than the original estimate.

Pledge name for payment

  • PLUMBING

Pledges

Provisional pledges from mailing list

withdrawn


Running total: £750

Target: £750

Paid: £750