Pledge: Basement plumbing: Difference between revisions

From London Hackspace Wiki
mNo edit summary
No edit summary
Line 45: Line 45:


Paid: '''£800'''
Paid: '''£800'''
SPENDING TO DATE: 28-3-14
<table>
<tr class="tableizer-firstrow"><th></th><th>&nbsp;</th><th>Date</th><th>&nbsp;</th><th>File in Expenses</th><th>&nbsp;</th><th>&nbsp;</th><th>&nbsp;</th><th>Total</th><th>&nbsp;</th><th>Grand Total</th></tr>
<tr><td>Tgreer</td><td>&nbsp;</td><td>16/03/2014</td><td>&nbsp;</td><td>2014031606-3.jpg</td><td>&nbsp;</td><td>3.99</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td></tr>
<tr><td>&nbsp;</td><td>&nbsp;</td><td>16/03/2014</td><td>&nbsp;</td><td>2014031606-2.jpg</td><td>&nbsp;</td><td>26.62</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td></tr>
<tr><td>&nbsp;</td><td>&nbsp;</td><td>16/03/2014</td><td>&nbsp;</td><td>2014031606-1.jpg</td><td>&nbsp;</td><td>38.7</td><td>&nbsp;</td><td>69.31</td><td>&nbsp;</td><td>&nbsp;</td></tr>
<tr><td>Will B</td><td>&nbsp;</td><td>22/01/2014</td><td>&nbsp;</td><td>2014012201.pdf</td><td>&nbsp;</td><td>223.8</td><td>&nbsp;</td><td>223.8</td><td>&nbsp;</td><td>&nbsp;</td></tr>
<tr><td>Paddy D</td><td>&nbsp;</td><td>15/01/2014</td><td>&nbsp;</td><td>2014011501-1.pdf</td><td>&nbsp;</td><td>16.46</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td></tr>
<tr><td>&nbsp;</td><td>&nbsp;</td><td>15/01/2014</td><td>&nbsp;</td><td>2014011501-2.pdf</td><td>&nbsp;</td><td>30.91</td><td>&nbsp;</td><td>47.37</td><td>&nbsp;</td><td>&nbsp;</td></tr>
<tr><td>&nbsp;</td><td>&nbsp;</td><td>16/03/2014</td><td>&nbsp;</td><td>2014031601-4.PDF</td><td>&nbsp;</td><td>6.42</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td></tr>
<tr><td>&nbsp;</td><td>&nbsp;</td><td>16/03/2014</td><td>&nbsp;</td><td>2014031601-3.PDF</td><td>&nbsp;</td><td>5</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td></tr>
<tr><td>&nbsp;</td><td>&nbsp;</td><td>16/03/2014</td><td>&nbsp;</td><td>2014031601-2.PDF</td><td>&nbsp;</td><td>12</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td></tr>
<tr><td>&nbsp;</td><td>&nbsp;</td><td>16/03/2014</td><td>&nbsp;</td><td>2014031601-1.PDF</td><td>&nbsp;</td><td>7.85</td><td>&nbsp;</td><td>31.27</td><td>&nbsp;</td><td>&nbsp;</td></tr>
<tr><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td></tr>
<tr><td>Russ</td><td>&nbsp;</td><td>25/11/2013</td><td>&nbsp;</td><td>2013112501.pdf</td><td>&nbsp;</td><td>134.43</td><td>&nbsp;</td><td>134.43</td><td>&nbsp;</td><td>506.18</td></tr>
</table>


[[Category:Pledges]]
[[Category:Pledges]]

Revision as of 14:54, 28 March 2014


Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013

Pledge leader: Will

The items

  • A pump to push waste water upstairs to main drain pipe.
  • Inflow and drainage pipes.

We should then have

  • Sink in the main workshop area with HOT WATER!
  • 1 Sink in PCB/darkroom area
  • working PCB etching tank
  • Sink in the Biolab

Budget estimation

  • £800. (£500 for pump and other items, rest on misc, or to be determined if there is excess funds. )


Pledge name for payment

  • PLUMBING

Pledges

Running total: £800

Target: £800

Paid: £800

SPENDING TO DATE: 28-3-14

 Date File in Expenses   Total Grand Total
Tgreer 16/03/2014 2014031606-3.jpg 3.99    
  16/03/2014 2014031606-2.jpg 26.62    
  16/03/2014 2014031606-1.jpg 38.7 69.31  
Will B 22/01/2014 2014012201.pdf 223.8 223.8  
Paddy D 15/01/2014 2014011501-1.pdf 16.46    
  15/01/2014 2014011501-2.pdf 30.91 47.37  
  16/03/2014 2014031601-4.PDF 6.42    
  16/03/2014 2014031601-3.PDF 5    
  16/03/2014 2014031601-2.PDF 12    
  16/03/2014 2014031601-1.PDF 7.85 31.27  
           
Russ 25/11/2013 2013112501.pdf 134.43 134.43 506.18