Pledge: Basement plumbing: Difference between revisions

From London Hackspace Wiki
mNo edit summary
No edit summary
 
(2 intermediate revisions by 2 users not shown)
Line 17: Line 17:


===Budget estimation===
===Budget estimation===
* £750. (£500 for pump and other items, rest on misc, or to be determined if there is excess funds. )
* £800. (£500 for pump and other items, rest on misc, or to be determined if there is excess funds. )


The budget was revised because the items came in cheaper than the original estimate.


===Pledge name for payment===
===Pledge name for payment===
Line 38: Line 37:
* <s>£25 - [[User:Fuxy|Fuxy]]</s> '''PAID'''
* <s>£25 - [[User:Fuxy|Fuxy]]</s> '''PAID'''
* <s>£25 - [[User:Ms7821|Mark]]</s> '''PAID'''
* <s>£25 - [[User:Ms7821|Mark]]</s> '''PAID'''
Provisional pledges from mailing list
*<s>£50 alphacabbage1  ([https://groups.google.com/d/msg/london-hack-space/Jdm1-gpyL2A/Ho-RoVa3oeAJ is donating directly with bank transfer ) </s>'''PAID'''
*<s>£50 alphacabbage1  ([https://groups.google.com/d/msg/london-hack-space/Jdm1-gpyL2A/Ho-RoVa3oeAJ is donating directly with bank transfer ) </s>'''PAID'''
*<s> £50 ܔܢܜܔηιηℓιℓιzιܔܢܜܔ‎ ( is a conditional donation https://groups.google.com/d/msg/london-hack-space/Jdm1-gpyL2A/8KaAbHvC1xAJ ) Payment was scheduled for 5th of November https://groups.google.com/d/msg/london-hack-space/Jdm1-gpyL2A/R9Y7ElTz2ecJ</s>'''PAID''' using reference ALLTHEPIPES


withdrawn
Running total: '''£800'''
 
*<s> £50 ܔܢܜܔηιηℓιℓιzιܔܢܜܔ‎ ( is a conditional donation https://groups.google.com/d/msg/london-hack-space/Jdm1-gpyL2A/8KaAbHvC1xAJ ) Payment was scheduled for 5th of November https://groups.google.com/d/msg/london-hack-space/Jdm1-gpyL2A/R9Y7ElTz2ecJ</s>
 


Running total: '''£750'''
Target: '''£800'''


Target: '''£750'''
Paid: '''£800'''


Paid: '''£750'''
==Spending to date==
{| class="wikitable"
|-
!Name!!Date!!File in Expenses!!Amount!!Total!!Grand Total
|-
| Tgreer||16/03/2014||2014031606-3.jpg||3.99||||
|-
| ||16/03/2014||2014031606-2.jpg||26.62||||
|-
| ||16/03/2014||2014031606-1.jpg||38.70||69.31||
|-
| Will B||22/01/2014||2014012201.pdf||223.80||223.80||
|-
| Paddy D||15/01/2014||2014011501-1.pdf||16.46||||
|-
| ||15/01/2014||2014011501-2.pdf||30.91||47.37||
|-
| ||16/03/2014||2014031601-4.PDF||6.42||||
|-
| ||16/03/2014||2014031601-3.PDF||5.00||||
|-
| ||16/03/2014||2014031601-2.PDF||12.00||||
|-
| ||16/03/2014||2014031601-1.PDF||7.85||31.27||
|-
| Russ||25/11/2013||2013112501.pdf||134.43||134.43||'''506.18'''
|}


[[Category:Pledges]]
[[Category:Pledges]]

Latest revision as of 12:24, 6 July 2014


Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013

Pledge leader: Will

The items

  • A pump to push waste water upstairs to main drain pipe.
  • Inflow and drainage pipes.

We should then have

  • Sink in the main workshop area with HOT WATER!
  • 1 Sink in PCB/darkroom area
  • working PCB etching tank
  • Sink in the Biolab

Budget estimation

  • £800. (£500 for pump and other items, rest on misc, or to be determined if there is excess funds. )


Pledge name for payment

  • PLUMBING

Pledges

Running total: £800

Target: £800

Paid: £800

Spending to date

Name Date File in Expenses Amount Total Grand Total
Tgreer 16/03/2014 2014031606-3.jpg 3.99
16/03/2014 2014031606-2.jpg 26.62
16/03/2014 2014031606-1.jpg 38.70 69.31
Will B 22/01/2014 2014012201.pdf 223.80 223.80
Paddy D 15/01/2014 2014011501-1.pdf 16.46
15/01/2014 2014011501-2.pdf 30.91 47.37
16/03/2014 2014031601-4.PDF 6.42
16/03/2014 2014031601-3.PDF 5.00
16/03/2014 2014031601-2.PDF 12.00
16/03/2014 2014031601-1.PDF 7.85 31.27
Russ 25/11/2013 2013112501.pdf 134.43 134.43 506.18