Pledge: Basement plumbing

From London Hackspace Wiki
Revision as of 14:54, 28 March 2014 by Padski (talk | contribs)


Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013

Pledge leader: Will

The items

  • A pump to push waste water upstairs to main drain pipe.
  • Inflow and drainage pipes.

We should then have

  • Sink in the main workshop area with HOT WATER!
  • 1 Sink in PCB/darkroom area
  • working PCB etching tank
  • Sink in the Biolab

Budget estimation

  • £800. (£500 for pump and other items, rest on misc, or to be determined if there is excess funds. )


Pledge name for payment

  • PLUMBING

Pledges

Running total: £800

Target: £800

Paid: £800

SPENDING TO DATE: 28-3-14

 Date File in Expenses   Total Grand Total
Tgreer 16/03/2014 2014031606-3.jpg 3.99    
  16/03/2014 2014031606-2.jpg 26.62    
  16/03/2014 2014031606-1.jpg 38.7 69.31  
Will B 22/01/2014 2014012201.pdf 223.8 223.8  
Paddy D 15/01/2014 2014011501-1.pdf 16.46    
  15/01/2014 2014011501-2.pdf 30.91 47.37  
  16/03/2014 2014031601-4.PDF 6.42    
  16/03/2014 2014031601-3.PDF 5    
  16/03/2014 2014031601-2.PDF 12    
  16/03/2014 2014031601-1.PDF 7.85 31.27  
           
Russ 25/11/2013 2013112501.pdf 134.43 134.43 506.18