Difference between revisions of "Pledge: Basement plumbing"

From London Hackspace Wiki
Jump to navigation Jump to search
m
Line 31: Line 31:
 
*<s>£10 - [[User:Rob Kam|Rob Kam]] </s>'''PAID'''
 
*<s>£10 - [[User:Rob Kam|Rob Kam]] </s>'''PAID'''
 
*<s>£25 - [[User:Oni|Oni]]</s> '''PAID'''
 
*<s>£25 - [[User:Oni|Oni]]</s> '''PAID'''
* £25 - [[Iser:wyan|wyan]]
+
* <s>£25 - [[User:wyan|wyan]]</s> '''PAID'''
 
* <s>£15 - [[User:Xianic|Xianic]]</s> '''PAID'''
 
* <s>£15 - [[User:Xianic|Xianic]]</s> '''PAID'''
 
* <s>£25 - [[User:Flux|Flux]] ([[User talk:Flux|talk]])</s> '''PAID'''
 
* <s>£25 - [[User:Flux|Flux]] ([[User talk:Flux|talk]])</s> '''PAID'''

Revision as of 10:01, 20 October 2013


Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013

Pledge leader: Will

The items

  • A pump to push waste water upstairs to main drain pipe.
  • Inflow and drainage pipes.

We should then have

  • Sink in the main workshop area with HOT WATER!
  • 1 Sink in PCB/darkroom area
  • working PCB etching tank
  • Sink in the Biolab

Budget estimation

  • £800. (£590 for pump, rest on pipes. )

Pledge name for payment

  • PLUMBING

Pledges

Provisional pledges from mailing list


Running total: £800

Target: £800

Paid: £700