Hackspace Move: Difference between revisions
(category update) |
|||
(2 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
'''This page is old! For the continuing refurbishment of the space, see [[447_Hackney_Road/Improvements]]''' | |||
We will soon move to a new space in [[447_Hackney_Road | 447 Hackney Road]]. This will be happening during March and April 2013. | We will soon move to a new space in [[447_Hackney_Road | 447 Hackney Road]]. This will be happening during March and April 2013. | ||
Line 79: | Line 81: | ||
[[Category:Moving_Space]] | [[Category:Moving_Space]] | ||
[[Category:Prior Hackspaces]] | |||
[[Category:Outdated Pages]] |
Latest revision as of 19:17, 21 October 2021
This page is old! For the continuing refurbishment of the space, see 447_Hackney_Road/Improvements
We will soon move to a new space in 447 Hackney Road. This will be happening during March and April 2013.
There's lots do do. Moving will be an enormous task, and will take at least an entire weekend (and probably several weeks worth of time in preparation). Here are some resources that help us coordinate this.
Location
See 447 Hackney Road.
How to Help
Open Tasks
If you have a bit of time and want to help out with the move, have a look at these lists.
- 447 TODO list (speak to User:marcbarto, User:Sully, User:JasperWallace for details)
- Power works list (speak to User:Padski for details)
- /Cremer_Restoration (speak to User:Asoko, User:SimonK, User:Padski for details)
- We need someone to monitor Freecycle (speak to Jasper for details); there's a /FreecycleList with requests
- ...
Getting Involved
If you have a bit of time and want to find out what there is left to do: have a look at the lists above, particularly /TODO#Simple_tasks_that_you_can_do_right_now, and have a chat with the people mentioned (or others who may know what's currently going on.)
If you have useful skills and want to help out with the move:
- join the Infrastructure mailing list: http://groups.google.com/group/london-hack-space-infrastructure
- join the infrastructure IRC channel on freenode.net, #london-hack-space-infrastructure
- Register to help here so we can plan well
Making Important Decisions
Make sure to keep in touch with others, things move quickly, and many people are thinking about overlapping problems. When you're coordinating an activity make sure to involve other people in larger decisions.
Specifically this could mean:
- Start discussing the task at hand with others, do research, find the right specialists.
- Write down a proposal.
- Show it to others, amend it. (Any Etherpad/PiratePad service is good for this.)
- For decisions that affect other teams, or the larger community: propose it on the infrastructure mailing list, or the main list (as appropriate)
As a result it stops being your idea, and will be shaped by others. But it will often be much better.
Planning
Expected schedule
We need to be out of Cremer St before 30th April. To leave time for restorations and cleanup the actual move will happen on the weekend of 13/14 April.
Notes
(Not all of these pages are maintained. Should sort these and merge as appropriate.) (We should merge these pages.)
- Key projects
- The new space layout (under discussion)
- Sizes and shapes of some existing equipment
- Restoration requirements for our current space
- List of stuff to try to find as cheap as possible
Planning updates
Progress updates
Frequently Asked Questions
See also New Space Search 2012#Frequently_Asked_Questions for a discussion of why a move is possible (and necessary) in 2013.
What modifications does our lease allow?
"Structural changes" need to be signed off by the landlord. This includes the erection of new walls, drilling large holes in existing walls (e.g. for ventilation), etc.
Non-structural changes are fine; this includes painting walls, markings, mounting of equipment and other small changes.
(Question)
(Answer)