Search results

Jump to navigation Jump to search
Results 1 – 53 of 53
Advanced search

Search in namespaces:

  
  
  
  
  
  
  
  
  
  
  
  
  
  
  

Page title matches

  • 31 bytes (3 words) - 22:00, 31 March 2019
  • {{#ask: [[Category:Equipment]] [[location::Basement, Robotics area]]
    497 bytes (71 words) - 18:54, 21 October 2021

Page text matches

  • ...inutes in the [https://london.hackspace.org.uk/members/minutes.php members area] of the Hackspace website - You will need to login
    179 bytes (30 words) - 09:48, 26 October 2019
  • |Leave in mail area and [[User:tenyen|contact]] me.
    121 bytes (18 words) - 17:38, 17 October 2013
  • == Areas of interest ==
    174 bytes (21 words) - 23:34, 10 March 2013
  • The main workshop area in the basement. Accessed through here are the * [[CNC Robotics area]].
    365 bytes (45 words) - 19:01, 21 October 2021
  • |location=Sewing area
    182 bytes (22 words) - 13:32, 24 November 2014
  • |location=Robotics Area, basement ...ntly on the table with the other sheet-metal forming tools by the robotics area.
    625 bytes (85 words) - 09:12, 15 February 2022
  • Meet in Basildon/Hastings at the train station. Choose your area to map. * Printout of the area your are surveying.
    748 bytes (119 words) - 23:20, 28 May 2013
  • |location=Basement machine tool area
    317 bytes (41 words) - 10:41, 25 July 2016
  • # Clean up the areas that need it most === Areas in desperate need of tidying ===
    2 KB (242 words) - 13:08, 27 September 2014
  • ...on. Wear gloves and disinfect them. Do not add anything to the linear flow area unless it is sterile.
    1 KB (175 words) - 19:00, 6 May 2015
  • ...that we'll make plenty back by offering cutting services to people in the area.
    358 bytes (55 words) - 20:23, 20 May 2013
  • ! style="color:red" | Area |Cage area
    923 bytes (119 words) - 07:58, 23 January 2024
  • The tasks are divided up into different areas of the space. Please add to this page! especially if there are areas of the hackspace that you think could be cleaner/tidyer/better managed!
    3 KB (413 words) - 19:57, 4 February 2015
  • |location=Basement, main workshop area
    261 bytes (35 words) - 12:15, 21 January 2019
  • |location=Arts/crafts area To use, make sure you're working in a well ventilated area. Don't use pine (too resinous), MDF (possibly toxic fumes), non-vegetable-d
    863 bytes (134 words) - 14:40, 18 June 2014
  • A laser moves over a 2D area of powder fusing the powder into a solid. When one layer is finished the be * Build area - a hole under the laser that drops down smoothly and evenly a distance as
    1 KB (253 words) - 15:29, 3 June 2013
  • |location=Basement, CNC area
    396 bytes (61 words) - 14:46, 2 January 2017
  • ...is due to launch on '''16th March 2014'''. This page summarises ideas for areas to work on for '''[[Project:Hackney_Space_Centre|Hackney Space Centre]]'''
    390 bytes (64 words) - 10:22, 13 March 2014
  • == lobby/social area == * 3in1 area: 200 x 200
    718 bytes (98 words) - 20:55, 20 May 2013
  • # <s>Tidy the Soldering area </s> == Social Area ==
    3 KB (497 words) - 23:12, 24 June 2012
  • ...ce is currently occupying an area within this space with an internal floor area of 1451 sqft. At the time of writing this is on a monthly license, but the == Local Area ==
    3 KB (416 words) - 19:39, 13 September 2023
  • ...n=Ground Floor central area <!-- Floor, room/zone and location within that area -->
    2 KB (256 words) - 22:03, 24 May 2021
  • {{#ask: [[Category:Equipment]] [[location::Basement, Robotics area]]
    497 bytes (71 words) - 18:54, 21 October 2021
  • ==storage areas== Shows currently used storage areas, messages stored, and capacity.
    1 KB (213 words) - 19:37, 21 October 2021
  • ...k to tinker some more but if anyone has any experience in the high-voltage area and would like to help out please let me know or just help yourself to the
    626 bytes (109 words) - 11:53, 25 February 2011
  • |location=Ground floor, electronics area, shelves near front door
    405 bytes (56 words) - 18:46, 2 January 2017
  • ...ther room in which the kids will be spending some time. Clear and cover an area where they can sit down on the floor in a group to do activities away from ...eeded. Clean the area, and store away/cover/unplug anything in the general area that is a potential safety hazard (including the new PCB etching tank.) Mak
    4 KB (610 words) - 16:43, 9 June 2013
  • * remove or move lathe to a smaller, more convenient bench area (requiring re-mounting of its motor - a non-trivial exercise) ...hing and other wood-related activity can be performed in the main basement area on the new workbenches. The planer and router-table will move out from the
    1 KB (216 words) - 10:28, 16 February 2015
  • ...ext to the electronics bench<!-- Floor, room/zone and location within that area --> ...eeprom programmer that lives in a box on the shelves near the electronics area. It has serial and parallel port connections and the cables are in the box.
    3 KB (441 words) - 21:09, 4 June 2013
  • |Can be destructive in populated areas. |Can cause serious damage over larger areas.
    3 KB (427 words) - 11:23, 8 May 2012
  • [[File:4831845812 1b90162ff2 o.jpg|300px|thumb|right|The main area]] [[File:Unit 23.jpg|300px|thumb|right|Our workshop area]]
    1 KB (213 words) - 21:44, 28 May 2013
  • |location=Basement, main workshop area
    401 bytes (51 words) - 17:50, 23 January 2019
  • == Hackney Rd, functional areas == ** Social area:
    2 KB (343 words) - 20:56, 20 May 2013
  • ** Build Area Temp Probe * Appears to be 4 wires coming from X/Y Axis Stepper area, but they don't appear to do anything regardless of the position of the X/Y
    1 KB (211 words) - 18:06, 31 May 2014
  • ** Furzton Lake: near lake (no sailing), but also near residential area; slightly boring but good fence, solid ground, very easy access. * we will have a kids' area, and a dedicated family/kids coordinator
    3 KB (497 words) - 23:57, 27 February 2012
  • *the social area.
    624 bytes (87 words) - 09:50, 15 August 2013
  • ...e was minging. I'm sure it created a poor impression for the visitors. The area where people were to eat and make drinks was barely fit for purpose. Also t :More generally, as regards the toilets (and to some extent the kitchen area) I really think it might be worth hiring cleaners for a couple of hours eve
    5 KB (855 words) - 18:08, 8 May 2013
  • HIGH - Do not undertake activity without further consultation with area specialists ...ch tools with extraction available Dust extraction should be used in the area near the tool if extractor fitting is not available. Respiration masks (p
    4 KB (567 words) - 08:16, 23 January 2024
  • * Photos/area map * Benefits: Logo on website, potential talk?, stand in a commercial/selling area, sponsor staff tshirts?
    4 KB (555 words) - 22:48, 19 December 2011
  • * Volunteers for maintaining tooling of the set areas, electronics/downstairs etc. (mentar) * CCTV (area coverage, monitoring of uptime) etc (tolland)
    7 KB (1,171 words) - 08:17, 21 April 2016
  • ...-week bins are on the 1st floor under the table in the light duty workshop area. If something is interesting, or vaguely useful, put it in the three week b ...uilding landlord (Meanwhile Space) provide dry recycling bins in the lobby areas, and general waste bins.
    2 KB (302 words) - 09:29, 12 November 2019
  • * electronics area: * social area:
    5 KB (750 words) - 00:44, 15 May 2013
  • ...n=Ground floor central area <!-- Floor, room/zone and location within that area -->
    2 KB (258 words) - 22:02, 24 May 2021
  • * 45 - 'Q17' in the 3d printing area * 46 - 'Q18' in the 3d printing area
    8 KB (1,266 words) - 18:52, 21 October 2021
  • # Area circuits: connections to equipment and outlets from each LDB ...or not we might need to use LS0H cable (''LS0H SWA Cable is used in public areas because the sheath only emits very low levels of smoke and non-toxic level
    5 KB (889 words) - 19:23, 21 October 2021
  • ** Creating a map of storage areas ** Improving the labelling of tools & storage areas, clean instructions on waste disposal
    2 KB (316 words) - 21:40, 20 May 2013
  • ==Hack Area== This year we'll be running the hack area, hacking, making, and talking to people about what we're doing. Pretty much
    5 KB (867 words) - 12:24, 30 August 2011
  • ** <s>The main area</s> * Move electronics gear from the back room to the electronics area
    5 KB (808 words) - 15:31, 28 February 2014
  • [[File:Unit 23.jpg|300px|thumb|right|Our new workshop area]] [[File:4831845812 1b90162ff2 o.jpg|300px|thumb|right|The main area]]
    2 KB (315 words) - 01:35, 29 May 2013
  • ...tion=Under Electronics Desks<!-- Floor, room/zone and location within that area --> ...scope, 150Mhz. Works fine. The probes on the shelves above the electronics area work fine with it.
    2 KB (279 words) - 21:54, 23 June 2016

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)