Search results

Jump to navigation Jump to search
Results 21 – 71 of 51
Advanced search

Search in namespaces:

  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  • ...ce is currently occupying an area within this space with an internal floor area of 1451 sqft. At the time of writing this is on a monthly license, but the == Local Area ==
    3 KB (416 words) - 19:39, 13 September 2023
  • ...n=Ground Floor central area <!-- Floor, room/zone and location within that area -->
    2 KB (256 words) - 22:03, 24 May 2021
  • {{#ask: [[Category:Equipment]] [[location::Basement, Robotics area]]
    497 bytes (71 words) - 18:54, 21 October 2021
  • ==storage areas== Shows currently used storage areas, messages stored, and capacity.
    1 KB (213 words) - 19:37, 21 October 2021
  • ...k to tinker some more but if anyone has any experience in the high-voltage area and would like to help out please let me know or just help yourself to the
    626 bytes (109 words) - 11:53, 25 February 2011
  • |location=Ground floor, electronics area, shelves near front door
    405 bytes (56 words) - 18:46, 2 January 2017
  • ...ther room in which the kids will be spending some time. Clear and cover an area where they can sit down on the floor in a group to do activities away from ...eeded. Clean the area, and store away/cover/unplug anything in the general area that is a potential safety hazard (including the new PCB etching tank.) Mak
    4 KB (610 words) - 16:43, 9 June 2013
  • * remove or move lathe to a smaller, more convenient bench area (requiring re-mounting of its motor - a non-trivial exercise) ...hing and other wood-related activity can be performed in the main basement area on the new workbenches. The planer and router-table will move out from the
    1 KB (216 words) - 10:28, 16 February 2015
  • ...ext to the electronics bench<!-- Floor, room/zone and location within that area --> ...eeprom programmer that lives in a box on the shelves near the electronics area. It has serial and parallel port connections and the cables are in the box.
    3 KB (441 words) - 21:09, 4 June 2013
  • |Can be destructive in populated areas. |Can cause serious damage over larger areas.
    3 KB (427 words) - 11:23, 8 May 2012
  • [[File:4831845812 1b90162ff2 o.jpg|300px|thumb|right|The main area]] [[File:Unit 23.jpg|300px|thumb|right|Our workshop area]]
    1 KB (213 words) - 21:44, 28 May 2013
  • |location=Basement, main workshop area
    401 bytes (51 words) - 17:50, 23 January 2019
  • == Hackney Rd, functional areas == ** Social area:
    2 KB (343 words) - 20:56, 20 May 2013
  • ** Build Area Temp Probe * Appears to be 4 wires coming from X/Y Axis Stepper area, but they don't appear to do anything regardless of the position of the X/Y
    1 KB (211 words) - 18:06, 31 May 2014
  • ** Furzton Lake: near lake (no sailing), but also near residential area; slightly boring but good fence, solid ground, very easy access. * we will have a kids' area, and a dedicated family/kids coordinator
    3 KB (497 words) - 23:57, 27 February 2012
  • *the social area.
    624 bytes (87 words) - 09:50, 15 August 2013
  • ...e was minging. I'm sure it created a poor impression for the visitors. The area where people were to eat and make drinks was barely fit for purpose. Also t :More generally, as regards the toilets (and to some extent the kitchen area) I really think it might be worth hiring cleaners for a couple of hours eve
    5 KB (855 words) - 18:08, 8 May 2013
  • HIGH - Do not undertake activity without further consultation with area specialists ...ch tools with extraction available Dust extraction should be used in the area near the tool if extractor fitting is not available. Respiration masks (p
    4 KB (567 words) - 08:16, 23 January 2024
  • * Photos/area map * Benefits: Logo on website, potential talk?, stand in a commercial/selling area, sponsor staff tshirts?
    4 KB (555 words) - 22:48, 19 December 2011
  • * Volunteers for maintaining tooling of the set areas, electronics/downstairs etc. (mentar) * CCTV (area coverage, monitoring of uptime) etc (tolland)
    7 KB (1,171 words) - 08:17, 21 April 2016
  • ...-week bins are on the 1st floor under the table in the light duty workshop area. If something is interesting, or vaguely useful, put it in the three week b ...uilding landlord (Meanwhile Space) provide dry recycling bins in the lobby areas, and general waste bins.
    2 KB (302 words) - 09:29, 12 November 2019
  • * electronics area: * social area:
    5 KB (750 words) - 00:44, 15 May 2013
  • ...n=Ground floor central area <!-- Floor, room/zone and location within that area -->
    2 KB (258 words) - 22:02, 24 May 2021
  • * 45 - 'Q17' in the 3d printing area * 46 - 'Q18' in the 3d printing area
    8 KB (1,266 words) - 18:52, 21 October 2021
  • # Area circuits: connections to equipment and outlets from each LDB ...or not we might need to use LS0H cable (''LS0H SWA Cable is used in public areas because the sheath only emits very low levels of smoke and non-toxic level
    5 KB (889 words) - 19:23, 21 October 2021
  • ** Creating a map of storage areas ** Improving the labelling of tools & storage areas, clean instructions on waste disposal
    2 KB (316 words) - 21:40, 20 May 2013
  • ==Hack Area== This year we'll be running the hack area, hacking, making, and talking to people about what we're doing. Pretty much
    5 KB (867 words) - 12:24, 30 August 2011
  • ** <s>The main area</s> * Move electronics gear from the back room to the electronics area
    5 KB (808 words) - 15:31, 28 February 2014
  • [[File:Unit 23.jpg|300px|thumb|right|Our new workshop area]] [[File:4831845812 1b90162ff2 o.jpg|300px|thumb|right|The main area]]
    2 KB (315 words) - 01:35, 29 May 2013
  • ...tion=Under Electronics Desks<!-- Floor, room/zone and location within that area --> ...scope, 150Mhz. Works fine. The probes on the shelves above the electronics area work fine with it.
    2 KB (279 words) - 21:54, 23 June 2016
  • ...nits. Each local distribution board will supply power to a given allocated area, which can be seen on the plans below. ...jacent, may be on different phases. '''Do NOT use extension leads from one area to feed equipment in another'''.
    8 KB (1,206 words) - 18:52, 21 October 2021
  • ...£2000 available to artists who make an installation proposal for the lobby area in the ground floor or in the middle workshop. Also maybe make money availa
    616 bytes (90 words) - 09:47, 26 October 2019
  • 21:33,1 August 2015 [[User:Blanca|Blanca Regina]] The darkroom area is built and started as a group. ...veloped In front of this area a big table 2 meters long at least for "dry area".
    5 KB (805 words) - 18:50, 21 October 2021
  • == Hack Area ==
    729 bytes (100 words) - 22:00, 28 May 2013
  • ...ly in the process of continous knowledge aquisition (past linear phase) in areas related to UAV from folks from ardupilot/copter and UDB developer communit
    805 bytes (118 words) - 11:53, 14 June 2012
  • ...so that darker areas are much brighter so that you don't end up with large areas of entirely black wood. <br>[[File:Engraving_curves.png|300px]]
    3 KB (436 words) - 09:44, 3 June 2014
  • = Areas = == Main Area ==
    4 KB (657 words) - 14:11, 1 July 2019
  • |location=Arts/crafts area <!-- Floor, room/zone and location within that area -->
    2 KB (325 words) - 13:32, 16 September 2015
  • |location=Ground floor, main area
    832 bytes (129 words) - 15:06, 9 August 2014
  • * Power runs to the social area: [[User:paddyd|paddy]]
    802 bytes (124 words) - 14:10, 8 October 2014
  • =====Wet area=====
    720 bytes (100 words) - 20:55, 20 May 2013
  • |location=Cabin<!-- Floor, room/zone and location within that area --> ...t are nearby so please use this device with extreme caution in an isolated area away from all other electronics.
    2 KB (346 words) - 23:57, 21 March 2015
  • ...mping ground in the basement between the wood racks and members boxes. The area is not supposed to be storage but became one during the space refurbishment After working through everything in the area we found that >50% of it was actual rubbish, and the majority of the remain
    5 KB (869 words) - 09:51, 23 November 2015
  • Approximate usable area is 250mm x 150mm
    807 bytes (127 words) - 12:24, 21 January 2019
  • * Sink in the main workshop area with HOT WATER! * 1 Sink in PCB/darkroom area
    3 KB (339 words) - 12:24, 6 July 2014
  • ...g things are happening in the yard. There's been talk of improving our BBQ area with proper lighting and a hydroponic veggie garden, not to mention the lar ...ard through the back door and along the brick wall, terminating at the BBQ area.
    2 KB (385 words) - 14:15, 27 April 2015
  • * Extractor fan for soldering area, out to window. * Notice Board Area
    2 KB (355 words) - 08:30, 5 July 2013
  • ...a selected area induce or promote this state if replayed back to the same area of the same or different person as electric or magnetic signal?
    3 KB (419 words) - 16:40, 13 November 2016
  • ...stems to Grade I & II Listed properties and the renovation of conservation area homes in London and the country.
    867 bytes (131 words) - 16:54, 4 October 2012
  • campaigns with the most signed up people in that area. Show statistics who have expressed support for the campaign in that area (blanks for
    3 KB (451 words) - 18:25, 28 May 2013

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)