Search results

Jump to navigation Jump to search
Results 1 – 264 of 264
Advanced search

Search in namespaces:

  
  
  
  
  
  
  
  
  
  
  
  
  
  
  

Page title matches

  • 31 bytes (3 words) - 22:00, 31 March 2019
  • {{#ask: [[Category:Equipment]] [[location::Basement, Robotics area]]
    497 bytes (71 words) - 18:54, 21 October 2021

Page text matches

  • ...inutes in the [https://london.hackspace.org.uk/members/minutes.php members area] of the Hackspace website - You will need to login
    179 bytes (30 words) - 09:48, 26 October 2019
  • |Leave in mail area and [[User:tenyen|contact]] me.
    121 bytes (18 words) - 17:38, 17 October 2013
  • == Areas of interest ==
    174 bytes (21 words) - 23:34, 10 March 2013
  • The main workshop area in the basement. Accessed through here are the * [[CNC Robotics area]].
    365 bytes (45 words) - 19:01, 21 October 2021
  • |location=Sewing area
    182 bytes (22 words) - 13:32, 24 November 2014
  • |location=Robotics Area, basement ...ntly on the table with the other sheet-metal forming tools by the robotics area.
    625 bytes (85 words) - 09:12, 15 February 2022
  • Meet in Basildon/Hastings at the train station. Choose your area to map. * Printout of the area your are surveying.
    748 bytes (119 words) - 23:20, 28 May 2013
  • |location=Basement machine tool area
    317 bytes (41 words) - 10:41, 25 July 2016
  • # Clean up the areas that need it most === Areas in desperate need of tidying ===
    2 KB (242 words) - 13:08, 27 September 2014
  • ...on. Wear gloves and disinfect them. Do not add anything to the linear flow area unless it is sterile.
    1 KB (175 words) - 19:00, 6 May 2015
  • ...that we'll make plenty back by offering cutting services to people in the area.
    358 bytes (55 words) - 20:23, 20 May 2013
  • ! style="color:red" | Area |Cage area
    923 bytes (119 words) - 07:58, 23 January 2024
  • The tasks are divided up into different areas of the space. Please add to this page! especially if there are areas of the hackspace that you think could be cleaner/tidyer/better managed!
    3 KB (413 words) - 19:57, 4 February 2015
  • |location=Basement, main workshop area
    261 bytes (35 words) - 12:15, 21 January 2019
  • |location=Arts/crafts area To use, make sure you're working in a well ventilated area. Don't use pine (too resinous), MDF (possibly toxic fumes), non-vegetable-d
    863 bytes (134 words) - 14:40, 18 June 2014
  • A laser moves over a 2D area of powder fusing the powder into a solid. When one layer is finished the be * Build area - a hole under the laser that drops down smoothly and evenly a distance as
    1 KB (253 words) - 15:29, 3 June 2013
  • |location=Basement, CNC area
    396 bytes (61 words) - 14:46, 2 January 2017
  • ...is due to launch on '''16th March 2014'''. This page summarises ideas for areas to work on for '''[[Project:Hackney_Space_Centre|Hackney Space Centre]]'''
    390 bytes (64 words) - 10:22, 13 March 2014
  • == lobby/social area == * 3in1 area: 200 x 200
    718 bytes (98 words) - 20:55, 20 May 2013
  • # <s>Tidy the Soldering area </s> == Social Area ==
    3 KB (497 words) - 23:12, 24 June 2012
  • ...ce is currently occupying an area within this space with an internal floor area of 1451 sqft. At the time of writing this is on a monthly license, but the == Local Area ==
    3 KB (416 words) - 19:39, 13 September 2023
  • ...n=Ground Floor central area <!-- Floor, room/zone and location within that area -->
    2 KB (256 words) - 22:03, 24 May 2021
  • {{#ask: [[Category:Equipment]] [[location::Basement, Robotics area]]
    497 bytes (71 words) - 18:54, 21 October 2021
  • ==storage areas== Shows currently used storage areas, messages stored, and capacity.
    1 KB (213 words) - 19:37, 21 October 2021
  • ...k to tinker some more but if anyone has any experience in the high-voltage area and would like to help out please let me know or just help yourself to the
    626 bytes (109 words) - 11:53, 25 February 2011
  • |location=Ground floor, electronics area, shelves near front door
    405 bytes (56 words) - 18:46, 2 January 2017
  • ...ther room in which the kids will be spending some time. Clear and cover an area where they can sit down on the floor in a group to do activities away from ...eeded. Clean the area, and store away/cover/unplug anything in the general area that is a potential safety hazard (including the new PCB etching tank.) Mak
    4 KB (610 words) - 16:43, 9 June 2013
  • * remove or move lathe to a smaller, more convenient bench area (requiring re-mounting of its motor - a non-trivial exercise) ...hing and other wood-related activity can be performed in the main basement area on the new workbenches. The planer and router-table will move out from the
    1 KB (216 words) - 10:28, 16 February 2015
  • ...ext to the electronics bench<!-- Floor, room/zone and location within that area --> ...eeprom programmer that lives in a box on the shelves near the electronics area. It has serial and parallel port connections and the cables are in the box.
    3 KB (441 words) - 21:09, 4 June 2013
  • |Can be destructive in populated areas. |Can cause serious damage over larger areas.
    3 KB (427 words) - 11:23, 8 May 2012
  • [[File:4831845812 1b90162ff2 o.jpg|300px|thumb|right|The main area]] [[File:Unit 23.jpg|300px|thumb|right|Our workshop area]]
    1 KB (213 words) - 21:44, 28 May 2013
  • |location=Basement, main workshop area
    401 bytes (51 words) - 17:50, 23 January 2019
  • == Hackney Rd, functional areas == ** Social area:
    2 KB (343 words) - 20:56, 20 May 2013
  • ** Build Area Temp Probe * Appears to be 4 wires coming from X/Y Axis Stepper area, but they don't appear to do anything regardless of the position of the X/Y
    1 KB (211 words) - 18:06, 31 May 2014
  • ** Furzton Lake: near lake (no sailing), but also near residential area; slightly boring but good fence, solid ground, very easy access. * we will have a kids' area, and a dedicated family/kids coordinator
    3 KB (497 words) - 23:57, 27 February 2012
  • *the social area.
    624 bytes (87 words) - 09:50, 15 August 2013
  • ...e was minging. I'm sure it created a poor impression for the visitors. The area where people were to eat and make drinks was barely fit for purpose. Also t :More generally, as regards the toilets (and to some extent the kitchen area) I really think it might be worth hiring cleaners for a couple of hours eve
    5 KB (855 words) - 18:08, 8 May 2013
  • HIGH - Do not undertake activity without further consultation with area specialists ...ch tools with extraction available Dust extraction should be used in the area near the tool if extractor fitting is not available. Respiration masks (p
    4 KB (567 words) - 08:16, 23 January 2024
  • * Photos/area map * Benefits: Logo on website, potential talk?, stand in a commercial/selling area, sponsor staff tshirts?
    4 KB (555 words) - 22:48, 19 December 2011
  • * Volunteers for maintaining tooling of the set areas, electronics/downstairs etc. (mentar) * CCTV (area coverage, monitoring of uptime) etc (tolland)
    7 KB (1,171 words) - 08:17, 21 April 2016
  • ...-week bins are on the 1st floor under the table in the light duty workshop area. If something is interesting, or vaguely useful, put it in the three week b ...uilding landlord (Meanwhile Space) provide dry recycling bins in the lobby areas, and general waste bins.
    2 KB (302 words) - 09:29, 12 November 2019
  • * electronics area: * social area:
    5 KB (750 words) - 00:44, 15 May 2013
  • ...n=Ground floor central area <!-- Floor, room/zone and location within that area -->
    2 KB (258 words) - 22:02, 24 May 2021
  • * 45 - 'Q17' in the 3d printing area * 46 - 'Q18' in the 3d printing area
    8 KB (1,266 words) - 18:52, 21 October 2021
  • # Area circuits: connections to equipment and outlets from each LDB ...or not we might need to use LS0H cable (''LS0H SWA Cable is used in public areas because the sheath only emits very low levels of smoke and non-toxic level
    5 KB (889 words) - 19:23, 21 October 2021
  • ** Creating a map of storage areas ** Improving the labelling of tools & storage areas, clean instructions on waste disposal
    2 KB (316 words) - 21:40, 20 May 2013
  • ==Hack Area== This year we'll be running the hack area, hacking, making, and talking to people about what we're doing. Pretty much
    5 KB (867 words) - 12:24, 30 August 2011
  • ** <s>The main area</s> * Move electronics gear from the back room to the electronics area
    5 KB (808 words) - 15:31, 28 February 2014
  • [[File:Unit 23.jpg|300px|thumb|right|Our new workshop area]] [[File:4831845812 1b90162ff2 o.jpg|300px|thumb|right|The main area]]
    2 KB (315 words) - 01:35, 29 May 2013
  • ...tion=Under Electronics Desks<!-- Floor, room/zone and location within that area --> ...scope, 150Mhz. Works fine. The probes on the shelves above the electronics area work fine with it.
    2 KB (279 words) - 21:54, 23 June 2016
  • ...nits. Each local distribution board will supply power to a given allocated area, which can be seen on the plans below. ...jacent, may be on different phases. '''Do NOT use extension leads from one area to feed equipment in another'''.
    8 KB (1,206 words) - 18:52, 21 October 2021
  • ...£2000 available to artists who make an installation proposal for the lobby area in the ground floor or in the middle workshop. Also maybe make money availa
    616 bytes (90 words) - 09:47, 26 October 2019
  • 21:33,1 August 2015 [[User:Blanca|Blanca Regina]] The darkroom area is built and started as a group. ...veloped In front of this area a big table 2 meters long at least for "dry area".
    5 KB (805 words) - 18:50, 21 October 2021
  • == Hack Area ==
    729 bytes (100 words) - 22:00, 28 May 2013
  • ...ly in the process of continous knowledge aquisition (past linear phase) in areas related to UAV from folks from ardupilot/copter and UDB developer communit
    805 bytes (118 words) - 11:53, 14 June 2012
  • ...so that darker areas are much brighter so that you don't end up with large areas of entirely black wood. <br>[[File:Engraving_curves.png|300px]]
    3 KB (436 words) - 09:44, 3 June 2014
  • = Areas = == Main Area ==
    4 KB (657 words) - 14:11, 1 July 2019
  • |location=Arts/crafts area <!-- Floor, room/zone and location within that area -->
    2 KB (325 words) - 13:32, 16 September 2015
  • |location=Ground floor, main area
    832 bytes (129 words) - 15:06, 9 August 2014
  • * Power runs to the social area: [[User:paddyd|paddy]]
    802 bytes (124 words) - 14:10, 8 October 2014
  • =====Wet area=====
    720 bytes (100 words) - 20:55, 20 May 2013
  • |location=Cabin<!-- Floor, room/zone and location within that area --> ...t are nearby so please use this device with extreme caution in an isolated area away from all other electronics.
    2 KB (346 words) - 23:57, 21 March 2015
  • ...mping ground in the basement between the wood racks and members boxes. The area is not supposed to be storage but became one during the space refurbishment After working through everything in the area we found that >50% of it was actual rubbish, and the majority of the remain
    5 KB (869 words) - 09:51, 23 November 2015
  • Approximate usable area is 250mm x 150mm
    807 bytes (127 words) - 12:24, 21 January 2019
  • * Sink in the main workshop area with HOT WATER! * 1 Sink in PCB/darkroom area
    3 KB (339 words) - 12:24, 6 July 2014
  • ...g things are happening in the yard. There's been talk of improving our BBQ area with proper lighting and a hydroponic veggie garden, not to mention the lar ...ard through the back door and along the brick wall, terminating at the BBQ area.
    2 KB (385 words) - 14:15, 27 April 2015
  • * Extractor fan for soldering area, out to window. * Notice Board Area
    2 KB (355 words) - 08:30, 5 July 2013
  • ...a selected area induce or promote this state if replayed back to the same area of the same or different person as electric or magnetic signal?
    3 KB (419 words) - 16:40, 13 November 2016
  • ...stems to Grade I & II Listed properties and the renovation of conservation area homes in London and the country.
    867 bytes (131 words) - 16:54, 4 October 2012
  • campaigns with the most signed up people in that area. Show statistics who have expressed support for the campaign in that area (blanks for
    3 KB (451 words) - 18:25, 28 May 2013
  • *the social area.
    901 bytes (137 words) - 10:53, 18 May 2014
  • ...tion=Ground floor, main area<!-- Floor, room/zone and location within that area -->
    1 KB (209 words) - 08:53, 2 June 2019
  • ...on = Basement, small shelves<!-- Floor, room/zone and location within that area --> ...keyboard and mouse for optimal use. There is a keyboard in the electronics area with the unit.
    2 KB (349 words) - 23:14, 11 October 2021
  • Laser-engraved John Lennon portrait (found above the sofa area)
    786 bytes (121 words) - 15:41, 4 January 2016
  • ...our [[Equipment/Staubli| Staubli industrial robot arm]] and the immediate area around it. ...ccesfullCNCcutUp.mp4 video]). We now need a table to create a safe working area to allow those who want to use for arm for whatever purpose, be it CNCing,
    3 KB (407 words) - 00:31, 16 October 2014
  • ...cific consumables listed for certain items on the [[equipment]] page, each area of the space manages it's own list of stock consumables which can be found
    1,001 bytes (161 words) - 07:36, 17 May 2023
  • We'll probably want to keep approximately the same split of areas as our current space, without reducing any of them in size. * Noise allowed. We make a lot of noise, and a residential area isn't going to cut it.
    6 KB (1,068 words) - 19:18, 21 October 2021
  • A suitable system is in place to control the access to the laboratory area within the building in order to ensure that only trained and responsible in '''Electrophoresis tank and Ethidium Bromide area'''
    14 KB (2,171 words) - 20:21, 26 January 2015
  • Ideally we want at least two rooms/areas - one carpeted for hacking, light electronics, and chilling out, and an un ...social and community entrepreneurs with ideas for transforming their local area"
    11 KB (1,661 words) - 20:08, 3 June 2013
  • ...he yard, for which we can provide access. We have a dedicated bike parking area with metal hoops, so you'll probably find it easier to leave it there too. == Local Area ==
    7 KB (1,144 words) - 18:51, 21 October 2021
  • Plotmate A3M plotter that appeared in the robotics area sometime in early 2015. As it has a standard pen holder it can be used to a
    1 KB (163 words) - 14:43, 29 May 2015
  • * Prepare the Quiet Room, and the workshop area (work benches) for older kids ** Done: hoovered the entrance area and removed a fair amount of small things, prepared a desk for bags etc
    6 KB (974 words) - 17:59, 25 March 2011
  • ...consumable stuff outside the lab, e.g across the way, shelves next to PCB area. [[User:Samb1|Sam]] ...people should not be able to dictated what happens with certain or other areas, and this is very difficult to deal with. Different subgroups should mana
    15 KB (2,719 words) - 21:03, 25 February 2016
  • == Yard area == ...space/room/area for organising workshops. A relatively quiet and spacious area/room with light, tables, chairs, projectors, speakers. This space would be
    4 KB (631 words) - 20:54, 20 May 2013
  • ** The staging area * Using and abusing the staging area (including stashing)
    4 KB (601 words) - 02:35, 29 May 2013
  • |location=Basement, main workshop area
    1 KB (165 words) - 22:15, 3 June 2013
  • * what areas do we want in the space; rooms suggested so far: ** where are the areas going to go
    8 KB (1,343 words) - 17:49, 8 May 2013
  • ...competition allow teams to focus their project towards a specific subject area within synthetic biology and allow them to know who they will compete again
    1 KB (197 words) - 12:20, 13 May 2014
  • * FTTC in area? microwave links to other areas?
    3 KB (513 words) - 23:46, 16 January 2012
  • In the bbq/garden area of the hackspace yard. * Install power out to bbq area
    4 KB (556 words) - 15:29, 23 March 2015
  • ...on the electronics workbench<!-- Floor, room/zone and location within that area -->
    2 KB (390 words) - 21:16, 4 June 2013
  • * Cleaned out the robotics area downstairs in preparation for casting on the 25th ...r CNC/Robotics area (http://wiki.london.hackspace.org.uk/view/CNC_Robotics_area)
    9 KB (1,479 words) - 13:24, 11 June 2014
  • ...ext to the electronics bench<!-- Floor, room/zone and location within that area --> Currently on the metal shelves next to the electronics area.
    4 KB (789 words) - 11:35, 6 December 2013
  • ...planning to have talks and workshops throughout the event, so any enclosed areas would be advantageous.
    1 KB (223 words) - 21:52, 8 December 2011
  • All work areas are to be cleaned after use and all equipment to be placed back in the cor * A storage area - We have a small amount of space to store ongoing member projects and we'r
    5 KB (839 words) - 08:17, 22 July 2022
  • HIGH - Do not undertake activity without further consultation with area specialists
    1 KB (192 words) - 08:33, 23 January 2024
  • ...or, general circulation area<!-- Floor, room/zone and location within that area -->
    2 KB (420 words) - 08:54, 2 June 2019
  • Our location at 447 Hackney Road is quite usable in general. Certain areas at the space are lit very poorly and lights are often failing due to their This area is typically least occupied part of the space but difficult when looking fo
    8 KB (1,317 words) - 23:45, 16 May 2015
  • ...space.svg|units 23 and 24]], [[Media:London-hackspace-marked.svg|with some areas marked by arrows]]. ...ubber feet. The dirty shop is also the main [[Membership#Storage|storage]] area.
    8 KB (1,242 words) - 19:12, 21 October 2021
  • |location=3D printer area, Ground floor
    1 KB (214 words) - 13:44, 11 August 2019
  • The centre manager is Ted Kerr (07730 200 260). Area manager is Paul - ask Russ to email him. * Heavy cabling needed from fusebox to planned cooking area
    4 KB (577 words) - 17:47, 21 July 2012
  • ...y there's a corkboard, chalkboard, and monitor scattered around the social area. Seems it would be better to bunch them together where the coat hooks use t
    4 KB (651 words) - 17:37, 13 October 2013
  • * The chill out area has been moved into the lobby to free up space for... ...iot]] has left some desks, some of these are being set up in the main room area previously occupied by the sofas and beanbags. [http://groups.google.com/gr
    5 KB (840 words) - 20:24, 20 May 2013
  • ...=Ground floor, display area <!-- Floor, room/zone and location within that area -->
    2 KB (321 words) - 18:20, 8 December 2019
  • ...ell ventilated spaces, sleeping often happens in the least well ventilated areas. Secondly it's been found that people are generally unhappy to wake up sle
    5 KB (900 words) - 06:39, 19 October 2017
  • | location = <!-- Floor, room/zone and location within that area --> There is a Prologic GPIB to Ethernet adaptor available in the electronics area. It connects a couple of meters to ethernet - and lets one do some automati
    3 KB (391 words) - 18:29, 29 May 2013
  • # Contact the maintainer(s) relevant to the particular area your equipment would be stored in to discuss what you have and what it migh !Item!!Subject Area/ Storage Location!!Owner!!Maintainer Approving Loan!!Date of Loan Start!!No
    5 KB (838 words) - 20:47, 12 May 2023
  • | Contact not interested in our event. Cable in surrounding area ...ble. [http://www.samknows.com/broadband/exchange/THWI FTTC] in surrounding area by the time we arrive.
    13 KB (1,955 words) - 10:47, 1 March 2012
  • ...wall of CNC/Metalwork room <!-- Floor, room/zone and location within that area --> ...ker message boards. There's one upstairs on the wall in the general table area and another one downstairs in the metalwork room.
    3 KB (432 words) - 09:04, 2 June 2019
  • ...solid base to so that it can be semi-permanently installed in the robotics area.
    1 KB (183 words) - 16:38, 17 October 2014
  • ...2013_August_Open_Day|Open day]]. Emptied all bins, cleaned up Electronics area. ...and_prepared|haircut]] from [[User:Nic_barber|Nic]]. Hoovered woodworking area and emptied a bunch of bins.
    5 KB (697 words) - 05:41, 25 October 2013
  • |location=Ground floor, crafts area
    2 KB (376 words) - 12:19, 1 December 2019
  • ...'''Saturdays (Single day class) from 12:00pm - 6:00pm''' in Craft/Workshop area of the London Hackspace.[[File:Example.jpg]]
    1 KB (246 words) - 22:47, 11 September 2014
  • * basics in woodwork / metal work - this is an area I want to learn loads more about.
    1 KB (199 words) - 23:45, 4 January 2017
  • ...lly consists of a body suit containing sensors and lights to cover various areas of the body. A toy gun is attached to the pack, the gun features a laser f ...infra red sensors and LED's, the sensors, to detect 'hits' to various body areas and the LED's to indicate various things such as the player being hit, the
    5 KB (800 words) - 14:44, 3 June 2013
  • ...top edge of the vertical ruler that is attached to the back of the cutting area. It's worth noting that this is at the same height as the bottom edge of th * '''Caution:''' There are a number of electrically live areas inside the cabinet towards the back. Be very careful when reaching around
    9 KB (1,566 words) - 07:06, 12 March 2022
  • ...ound Floor, Electronics area<!-- Floor, room/zone and location within that area -->
    2 KB (403 words) - 19:06, 14 February 2018
  • HIGH - Do not undertake activity without further consultation with area specialists
    2 KB (210 words) - 08:33, 23 January 2024
  • * Use a glass jar to wash them (there is one in the paint area), you can beat them about inside vigorously without worrying about it tippi
    2 KB (287 words) - 08:40, 24 June 2013
  • ...Basement, main workshop area<!-- Floor, room/zone and location within that area --> ...hrougherly. (Mostly) put back together. Motion much smoother now in main area, though travel still stiff at tailstock end, not too worried about that as
    6 KB (1,032 words) - 20:59, 15 August 2015
  • * Prepare the Quiet Room, and the workshop area (work benches and sitting areas) ** Todo: hoover the entrance area and removed a fair amount of small things, prepare a desk for bags etc
    12 KB (2,027 words) - 09:47, 31 July 2011
  • |location=Metalworking shop<!-- Floor, room/zone and location within that area --> * Brush swarf from the clamping area
    6 KB (1,060 words) - 12:56, 21 January 2022
  • (j) prohibiting in the work area eating, drinking, smoking, applying cosmetics or the storing of food for hu
    2 KB (199 words) - 13:28, 6 May 2014
  • ...ics area near the front door<!-- Floor, room/zone and location within that area --> ...ics area near the front door<!-- Floor, room/zone and location within that area -->
    7 KB (1,250 words) - 08:49, 2 June 2019
  • | In the alcove between the shelving units and the wall of the main hacking area.
    2 KB (259 words) - 19:08, 21 October 2021
  • * Suitable candidates are likely to be more expensive per unit area, as it seems hard to justify moving without being more central.
    1 KB (199 words) - 20:09, 3 June 2013
  • **Safe Working Area **Clean workshop floor area
    6 KB (992 words) - 11:24, 28 September 2022
  • Area excluding floor is about 60m^2.
    2 KB (290 words) - 04:57, 27 June 2015
  • ...ext to the electronics bench<!-- Floor, room/zone and location within that area -->
    2 KB (388 words) - 12:12, 25 August 2014
  • # Create some [[#Improvements|signs and a map]] for key areas and equipment in the space. ...e accessibility for new members with more interior signage. We could label areas, large tools, projects - perhaps have the signs on the ceiling for easier
    10 KB (1,597 words) - 08:45, 18 September 2011
  • Can take 3 people from the St Albans and surrounding areas
    2 KB (263 words) - 17:52, 28 May 2013
  • This will contain various jigs that currently exist in the woodworking area as well as a list of planned jigs.
    2 KB (321 words) - 10:39, 13 June 2021
  • Theyre planning to run a soldering workshop for 30+ people in a large area, we'd be involved with that (by selling kits and assisting people with sold
    1 KB (269 words) - 19:36, 8 May 2013
  • [[File:Unit 23.jpg|400px|thumb|right|Our new workshop area]]
    2 KB (290 words) - 18:49, 21 October 2021
  • <s>'''Status:''' It's sustained damage to the sampling area, and we are missing some bits. Repairing is likely to be very $$$, so we ar
    2 KB (342 words) - 15:08, 2 January 2015
  • ...r the space: We're using the entirety of Unit 23 as a workshop and storage area, which leaves the whole of our original space clear and free to use for des
    2 KB (294 words) - 22:29, 19 January 2011
  • [[File:Darkroom_wet_area.jpeg|thumbnail|right|"Wet area" with sinks]] * Set up screen printing area (needs a bench to be built in the small corridor outside the darkroom door)
    6 KB (896 words) - 20:26, 18 October 2018
  • ...ea, next to members shelving<!-- Floor, room/zone and location within that area -->
    3 KB (432 words) - 08:51, 31 January 2022
  • ...hing and other wood-related activity can be performed in the main basement area on the new workbenches. ...lathe will either be removed or moved to a smaller, more convenient bench area (requiring re-mounting of its motor - a non-trivial exercise)
    6 KB (911 words) - 13:23, 19 August 2015
  • ...ser/dp/2067881?Ntt=eagle+hobbyist Hobbyist license] costs £120. The layout area is restricted to a maximum of 160mm x 100mm (6.3inch x 3.9inch), a schemati ...ckness of copper denoted by the weight of copper spread over a 1 ft square area (in Ounces). Typically this is 1 oz for external layers, and less for inte
    16 KB (2,372 words) - 02:30, 27 January 2021
  • ...k) The 'whiteness' of the etching is inconsistent, looking dirty/smokey in areas where it was denser. I'm guessing maybe some of the smoke? got annodized i
    2 KB (286 words) - 10:42, 21 March 2014
  • * d) testing for GMOs outside the containment area * Area must be designed to prevent spillage of entire closed system, modulo R.A.
    11 KB (1,743 words) - 20:20, 26 January 2015
  • Before being twittered, the image is cropped to the approximate area of the detected face. This is important in order to respect people's privac boolean drawArea = true;
    6 KB (778 words) - 00:48, 29 May 2013
  • ...ep personal items in an LHS provided storage box in the designated storage area without asking permission.
    2 KB (297 words) - 14:01, 28 February 2014
  • ...ake use of the arms 3 axis of motion and relatively large platform working area.
    2 KB (281 words) - 22:00, 24 May 2021
  • ...p over time with use, with floor-standing partitions not only to demarcate areas but also to provide somewhere to hang tools and lighter storage.
    2 KB (312 words) - 22:35, 30 August 2023
  • *Clean workshop floor area *Safe Working Area
    7 KB (1,074 words) - 22:22, 27 October 2022
  • I am active in the workshop and have historically been focused in the metal area, I come from the local area and have lived in Hackney all of my life. It is great to see such a great
    14 KB (2,476 words) - 00:10, 20 November 2015
  • ...happened, the heroes will be free to achieve their goal and exit the play area.
    2 KB (354 words) - 02:09, 7 May 2011
  • ...all mucked in to remove the paintings. We now have more space in the sofa area and the weird shelves above the stairs have been emptied for our use.
    2 KB (326 words) - 20:22, 20 May 2013
  • * Description: optimise storage areas etc * The light table becomes the 3d printing/scanning area, and can still be used as a light table if need be
    7 KB (1,025 words) - 18:54, 21 October 2021
  • | location = <!-- Floor, room/zone and location within that area --> The electronics area currently has a HP3488A Electronic Switch Unit with [[GPIB]] on loan ([[Use
    3 KB (552 words) - 16:55, 29 May 2013
  • ...tion=Ground floor, main room<!-- Floor, room/zone and location within that area --> We have a HPC LS3060 laser engraver and cutter, with a cutting area of 300mm x 560mm. Trained [[Membership | members]] can use it for the very
    15 KB (2,184 words) - 00:43, 23 December 2015
  • ...ound Floor, Electronics area<!-- Floor, room/zone and location within that area -->
    3 KB (398 words) - 22:22, 29 May 2013
  • ...''member's name and membership number''' and should be left in the storage areas.
    2 KB (346 words) - 10:52, 20 November 2019
  • ...tairs by the riser to the left of the ground floor fire door to the common area, the power cables should be detached from the main distro panel and feed ba
    2 KB (383 words) - 22:11, 24 May 2021
  • One of my friends from the bay area, [https://www.linkedin.com/in/donstein/ Don Stein], is moving to London for * Identify key areas to automate
    26 KB (4,111 words) - 15:29, 30 July 2019
  • ...hen get in touch with [[User:Martind | martind]]. (Best if you're from the area, we're in [[447 Hackney Road|E2 9DY]].)
    2 KB (361 words) - 10:54, 30 October 2017
  • |location=3D printer area, Ground floor
    2 KB (359 words) - 13:37, 21 February 2022
  • ...printer area, Ground floor <!-- Floor, room/zone and location within that area --> *Usable Print Area: 270mm x 270mm x 300mm
    10 KB (1,552 words) - 15:09, 31 December 2016
  • ...rmake.co.uk/ Laser/Make] Well-priced lasercuttig in Finsbury Park/Haringey area * [http://www.cornelissen.com/ Cornelissen & Son] Holborn area. Pretty shop. Stocks some interesting papers, vellum, parchment, etc but ta
    31 KB (4,633 words) - 22:44, 26 November 2022
  • ...on the points laid out below, provision will be made for exploring certain areas in more detail if particular interest is expressed by participants. Univer
    3 KB (418 words) - 18:10, 8 May 2013
  • ...it in at power level 3, then wait until you can smell it from the main lab area. -alecjw
    2 KB (353 words) - 19:22, 21 October 2021
  • ...nd floor connected to an 8 channel controller and a TV in the small office area behind the counter. There is also a multi output power supply (12V) attache
    2 KB (408 words) - 18:50, 21 October 2021
  • The screen on one side has been damaged and a roughly 10x10 pixel area is dead. | Internal data area || 256 bytes based at xxe00
    8 KB (1,059 words) - 23:37, 13 December 2015
  • * The [[Project:ServerHardwareAuction|server hardware auctions project]] has just listed the set of externa ...ireuk.com/ Maker Faire UK] in Newcastle, where we helped run the hackspace area and various hacking took place. Interesting projects by members included:
    3 KB (460 words) - 20:24, 20 May 2013
  • * The T692A is 1,500W and has a PCB area of about 300 × 320 mm.
    3 KB (417 words) - 16:33, 17 October 2014
  • ..., please see the [http://london.hackspace.org.uk/members/night.php members area] to obtain the code if needed.''' [https://groups.google.com/group/london-h
    3 KB (484 words) - 09:49, 4 June 2013
  • |electronics area, why is this poe? (I probably have the wrong port)
    2 KB (329 words) - 15:32, 30 December 2018
  • ...ion=Robotics Area Downstairs<!-- Floor, room/zone and location within that area -->
    4 KB (607 words) - 22:20, 24 May 2021
  • On the window sill in the craft area near the laser cutter we've got:
    3 KB (414 words) - 23:07, 16 November 2021
  • it's in a classified radiation area: "This tour should be avoided if you have a
    3 KB (401 words) - 20:17, 29 June 2011
  • ...hese people have been the driving force behind everything positive in that area that has happened in that timeframe. My initial area of interest is the C++11 concurrency model, locking primitives, and memory
    10 KB (1,680 words) - 22:13, 1 October 2012
  • * BBQ area
    3 KB (446 words) - 19:05, 21 October 2021
  • ...ge" with lots of lights connected to the same loop. It may help if certain areas were re-wired to make the switches more discrete. An example would be to h
    3 KB (442 words) - 19:02, 21 October 2021
  • ...in 2021 I loved every minute of our time at Ujima house. I dabbled in all areas of the space but was mostly to be found in the metal and wood shops. I hel
    3 KB (512 words) - 12:13, 7 January 2024
  • ...al mould-making and ceramic areas and over 1,500 sq ft of flexible working areas."
    12 KB (1,733 words) - 21:23, 5 April 2018
  • |location=Arts/crafts area
    4 KB (713 words) - 14:37, 18 June 2014
  • | Small milling machine || Unplugged and moved to the triage area of basement (to make space for Bridgeport?). Currently unusable as a result
    3 KB (456 words) - 15:49, 1 December 2016
  • * cleaning the area and the machine.
    3 KB (472 words) - 00:18, 30 June 2016
  • Is the laser-cutter working? Members can log in to the members area to find out: * 1200mm by 900mm cutting area (slightly larger than [https://en.wikipedia.org/wiki/ISO_216 A0] sized)
    13 KB (2,101 words) - 18:00, 10 October 2022
  • Probably around the arts and crafts area. Due to the external ink resoviour it should be moved as infrequently as po
    3 KB (465 words) - 18:07, 10 January 2014
  • * There are plans for a combined soldering and openhack area at the [http://www.makerfairebrighton.com/makers/ Brighton Mini Maker Maire
    4 KB (674 words) - 20:25, 20 May 2013
  • ...ink we need to make sure that the Space caters for this element and has an area that is dedicated to them. People will then be able to trade skills, or lea
    14 KB (2,581 words) - 16:55, 6 December 2012
  • ...adwood| Bradley Wood]], [[User:Jayuk| James Cadman]]|| This is quite a big area: from basic resistor usage, to transistors, mosfets, relays, triacs, etc.
    3 KB (470 words) - 21:28, 15 January 2014
  • ...lasses are '''only to be used with LN2 and should be returned to the dewar area after use'''. No using them for welding or angle grinding for example! '''D
    4 KB (651 words) - 21:54, 31 October 2013
  • # Work areas should be disinfected with Surgical spirit before work commences.
    4 KB (532 words) - 22:15, 26 January 2015
  • ...t Settings''', and paste the output of the last command into the '''Key''' area.
    4 KB (710 words) - 18:09, 23 November 2018
  • This is a page to properly organise the Electronics Group and the electronics area that we might end up with.
    4 KB (479 words) - 16:39, 8 July 2022
  • HIGH - Do not undertake activity without further consultation with area specialists
    3 KB (528 words) - 08:02, 23 January 2024
  • ...ith the eventual aim of, perhaps, more individual monitoring of devices or areas of the space i.e. per table or per large multibrick
    4 KB (528 words) - 19:03, 21 October 2021
  • *restricted areas (lift machinery, boiler room, electrical intake room)
    3 KB (533 words) - 19:31, 21 October 2021
  • I believe that we need to focus on a few main areas:
    4 KB (682 words) - 09:40, 1 December 2017
  • and work areas are being installed. The more members who can help, the
    6 KB (698 words) - 17:42, 1 August 2018
  • ...esis and respiration. The Erlenmeyer flasks also taper to maximize surface area of the liquid-air interface for improved gas exchange. The included L1 Alga
    4 KB (576 words) - 20:21, 26 January 2015
  • |Large items in the member's area, with their owner's approval
    4 KB (635 words) - 20:54, 20 May 2013
  • ...e needed. The Pi will measure water levels both in the basement and in the area outside the emergency exit and in Variant B inside, as well as in both wate
    4 KB (698 words) - 23:24, 18 July 2016
  • We've going to have a much larger "classroom" area in the new space and although we've got loads of tables in storage we don't
    4 KB (656 words) - 20:53, 20 May 2013
  • ...ube for transporting a laser, but it's now donated to the space in the PCB area.
    4 KB (627 words) - 19:38, 15 September 2023
  • ...er needs internal examination for creepy crawlies before final move to new area)
    4 KB (669 words) - 19:19, 21 October 2021
  • ## Hand tools area
    4 KB (661 words) - 13:43, 3 April 2019
  • * LEDs Per Area LEDs/m2 67,635 Physical Pixels Per Area pixels/m2 22,545
    16 KB (2,248 words) - 18:57, 7 March 2016
  • ...on more responsibility (both fiscal and organisational) for their specific areas of the space, and that is still true. While trustees have no more control * Better accessibility for tools and areas of the space
    20 KB (3,440 words) - 14:24, 6 April 2018
  • | Brent || Learning networking basics, and related knowledge areas like Linux KVM virtualisation. Hands-on with some physical setup sounds go
    5 KB (738 words) - 22:02, 31 March 2019
  • ...bandoned are liable to be thrown away or repurposed to recover the working area and the components in them. Any project can be proposed for this treatment
    4 KB (632 words) - 19:25, 21 October 2021
  • ...Basement, Robotics/CNC area <!-- Floor, room/zone and location within that area -->
    5 KB (836 words) - 11:53, 21 January 2019
  • ...running start-up companies and treating the space like a cheap co-working area
    4 KB (665 words) - 14:03, 19 October 2012
  • ...(signed up, waiting for confirmation; mailman at a10medialab@crealab.info) Area 10 Lab http://a10lab.info/
    5 KB (781 words) - 18:49, 14 September 2010
  • ...st just for the sake of it, but many hackspacers are professionals in some area and see no reason to do jobs for peanuts for which they would normally char
    5 KB (833 words) - 23:00, 18 July 2013
  • Attempted diagnosis print across the whole bed area to confirm that the air assist nozzle is not being hit at any point. "Run box" caused the print head to leave the print area and make a grinding noise, test aborted.
    56 KB (9,513 words) - 17:12, 23 December 2014
  • ...your LDAP login - if you don't have one you can create one in the members area of the LHS web site, (https://london.hackspace.org.uk/members/ldap.php) or
    4 KB (724 words) - 18:38, 19 November 2017
  • These are the main areas of interest identified so far, any suggestion/idea is very welcome :
    5 KB (705 words) - 02:09, 29 May 2013
  • ...ed activity) would require care not to interfere other members use of that area. Other spaces are available but their use will interfere with member activi
    5 KB (905 words) - 07:08, 11 September 2022
  • Engraved Wood should exhibit a discernable shading, showing light and dark areas of engraving.
    5 KB (698 words) - 00:26, 29 May 2013
  • ...the help of other members, I have worked on organising the project storage area, scrap wood pile, I have made a mini router table for everyone to use. <br
    5 KB (933 words) - 12:02, 16 December 2021
  • '''NB: This refers to the storage area ''under'' the stairs. It does not block the fire escape'''
    4 KB (736 words) - 17:19, 31 January 2016
  • Because it rules. The current mill is quite nice, but has a small working area - the current lathe makes a lot of heat and noise but is rather challenging
    5 KB (716 words) - 18:40, 29 October 2013
  • ...fire evacuation plan. This is displayed on various posters in the communal areas of the building
    6 KB (1,043 words) - 08:40, 16 January 2024
  • ...tronaut.com/index/Shop_2.html "food kits"]) He's also vaguely local to the area and we might be able to convince him to come around and do some cool demos?
    6 KB (839 words) - 19:07, 20 May 2013
  • A rough outline for temporary storage areas in 447 is here: [[Hackspace_Move/Logistics]]</s>
    5 KB (787 words) - 14:31, 27 April 2015
  • a packet BBS as well as a repeater. If any readers are in the area and
    7 KB (900 words) - 05:39, 1 June 2018
  • ...ot. It could probably do with a LED light as well to illuminate and create areas of contrast. For 2D stuff it seems like people detect features such as co
    5 KB (873 words) - 20:18, 23 December 2011
  • It's very near Kings Cross/St. Pancras area http://www.creativecollaboration.org.uk/where.php
    6 KB (968 words) - 22:17, 28 May 2013
  • ...od choice if you have difficult problems to address: as I can research the area; read the code; investigate the problem and propose solutions.
    5 KB (838 words) - 14:24, 27 April 2015
  • ...duino and you get a pretty flashing one (perhaps with a bit of prototyping area) along with the workshop. --[[User:Artag|Artag]] 21:22, 26 July 2010 (UTC)
    6 KB (964 words) - 00:43, 8 August 2010
  • |location=Basement, CNC area
    6 KB (942 words) - 11:52, 21 January 2019
  • |location=Basement, CNC area<!-- Floor, room/zone and location within that area -->
    7 KB (1,325 words) - 11:50, 21 January 2019
  • Please leave the Robotics area tidy, and replace the dust cover on the Ultimaker before you departs.
    7 KB (1,134 words) - 20:39, 16 November 2015
  • ...s, the two new V. fischeri cultures are glowing very strongly on the first areas streaked. Can't see much from anything else.
    5 KB (885 words) - 15:11, 3 June 2013
  • == Local Area ==
    7 KB (1,025 words) - 07:24, 17 May 2023
  • ...oard should be more solder-friendly due to thinner traces (smaller thermal area) and copper hints about what goes where. As another new feature, this board
    7 KB (1,075 words) - 12:14, 21 April 2011
  • Areas that need your help: ** have rooms/areas that are marked as "on fire" or "radioactive"
    7 KB (1,199 words) - 14:27, 17 May 2012
  • ...caution]). Ball bearings are easier to deal with a less messy. Some early areas to consider include:
    6 KB (1,065 words) - 21:58, 13 October 2012
  • I started the [http://wiki.hackspace.org.uk/wiki/Project:ServerHardwareAuction server hardware auction] which has already earned us several thousand * however my experience with the other org has shown me that there are two areas where the Hackspace will need to be cautious in its decisions
    8 KB (1,314 words) - 11:51, 4 August 2011
  • ...dle Room room, crafts corner<!-- Floor, room/zone and location within that area --> ...l here]. You can find the cable in the knitting machine crate on the craft area shelves.
    9 KB (1,391 words) - 21:58, 19 August 2022
  • * '''1200x900mm''' cutting area (our current machine is 560x300mm)
    8 KB (1,173 words) - 13:55, 1 May 2015
  • ...just above the login prompt) and put them both in the [[Project:ServerHardwareAuction#Hardware_List | Hardware List]] below See [[Project:ServerHardwareAuction/NetBootServer]] for more details
    8 KB (1,258 words) - 13:22, 8 October 2014
  • [[File:Solderingstationjun2012.jpg|thumb|300px|The Electronics/Soldering Area]]
    7 KB (1,105 words) - 18:42, 7 September 2014
  • ...and joint. The nozzle allows a flow of inert shield gas around the working area, reducing slag creation and (particularly important with aluminium) oxidati
    8 KB (1,202 words) - 09:39, 1 September 2022
  • ...oor, main area, marble desk <!-- Floor, room/zone and location within that area -->
    8 KB (1,184 words) - 11:14, 18 November 2019
  • ...w away any rubbish and put useful leftovers in the storage. Leave the work area better than you found it.
    9 KB (1,601 words) - 19:04, 21 October 2021
  • ...resent to carry out welding, as well as using a welding screen, a suitable area should be cleared of anything that might get damaged or catch fire, about 8
    8 KB (1,390 words) - 12:27, 16 May 2013
  • ...bacterial cellulose has a very high tensile strength and has been used in areas from fashion design to medical wound dressings.
    9 KB (1,320 words) - 05:22, 6 October 2014
  • |location=Arts/crafts area
    9 KB (1,379 words) - 13:02, 17 February 2019
  • ...ects/Infrastructure/1stFloor/Electrics/Build-AreaLighting| 1st Floor Build-area Lighting]]
    10 KB (1,335 words) - 02:26, 8 January 2019
  • [[File:Labelledshelves1.jpg|200px|thumb|right|The members personal storage area]]
    9 KB (1,490 words) - 08:28, 5 July 2013
  • Display Area 37.6cm horizontal x 30.1cm vertical; 48.3cm diagonal
    8 KB (1,133 words) - 13:22, 8 October 2014
  • * approx area to brick up in loo: 1000 x 2700mm
    9 KB (1,613 words) - 20:53, 20 May 2013
  • ...to the rear roller shutters <!-- Floor, room/zone and location within that area --> ...etely clean?'''<br />If so, move on to the next step. If not, choose a new area of dirty floor, empty out your dirty water and go back to step 2. Don't wor
    11 KB (1,991 words) - 19:54, 15 December 2014
  • Razoumnikova O.M. Functional organization of different brain areas during convergent and divergent thinking: An EEG investigation // Cogn. Br
    8 KB (981 words) - 16:11, 26 January 2015
  • ...lled on the ceiling, having re-routed two network sockets from the kitchen area above. The remainder of the sockets in the patch panels are fair game. We w
    11 KB (1,688 words) - 17:32, 31 October 2021
  • #Have a clear, well lit work area so you don't loose any of the small parts.
    10 KB (1,923 words) - 20:26, 8 May 2013
  • ...ctivity. It will go deaf on a high gain external antenna, especially in an area with lots of RF sources.<!-- https://groups.yahoo.com/neo/groups/mobilinkd/
    11 KB (1,795 words) - 20:03, 6 May 2015
  • ...see any of these printers available for customer engagement in the London area.
    12 KB (1,850 words) - 17:39, 23 April 2015
  • ...find a full list in the [http://london.hackspace.org.uk/login.php members area].
    13 KB (1,435 words) - 13:44, 26 May 2018
  • ...the power-supply but there is nothing obviously wrong with it despite some areas of corrosion. Didn't have enough time to take it fully out of the enclosur
    11 KB (1,858 words) - 22:23, 7 March 2016
  • You pick it up. In the members storage area there is a pile of empty unmarked boxes, claim one, pick a lid, put your na
    17 KB (3,053 words) - 12:26, 18 August 2019
  • ...don.hackspace.org.uk/members/cards.php in the cards section] of the member area.
    16 KB (2,795 words) - 15:27, 5 November 2022
  • ...org/ Carmarthen] and Medway. These are all very small, so if you're in the area, find out what's going on.
    25 KB (3,847 words) - 09:50, 4 June 2013
  • ...move excess material from the inverted brush in the machine and from other areas in the machine and close the door. Reposition the left "build material" ti
    18 KB (2,925 words) - 12:29, 23 May 2013
  • (j) Prohibiting in the work area eating, drinking, smoking, applying cosmetics or the storing of food for hu
    20 KB (3,069 words) - 20:21, 26 January 2015
  • Here is the file [http://tuxgraphics.org/common/src2/article09041/ download area]
    50 KB (8,504 words) - 18:07, 25 July 2016